Laserfiche WebLink
Studion , CA <br />1990Picco1Road <br />Merharo Shop <br />T1. Diesel US \ <br />!Direct Bury Spill Bucket <br />UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: 11/8/2018 <br />If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification Form. The site plan must show the general layout ot tanks and piping and clearly identify locations of the following equipment, <br />if installed: 1) monitoring system control panels; 2) In-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br />annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br />monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas. <br />Ll Nru'er <br />L2 STP Sap <br />---L3 SW Sump (High Flow)