Laserfiche WebLink
BUILDING <br />• <br />Turbine Turbine Turbine ° —1 <br />Sump Sump Sump <br />1 2 3 <br />on% . tttttttttttt <br />ttt tt:Itt1;n, <br />VA:1%1W <br />C1:111.2f2 Pad <br />10 1-eet - Min. Distance <br />Per NFPA 30A <br />SAFETY <br />CONES <br />TAPE / WEIGHT DOWN <br />CABLE TO PREVENT <br />ACCIDENTAL <br />MOVEMENT DURING <br />LEAK TESTING <br />(PROBE CABLE <br />PH: 600-0200 <br />- 50 FEET) <br />GROUNDED <br />3 PRONG <br />EXTENSION <br />CORD REQ'D <br />A MI MI III MI III MI eN•11.11.0•M NE•OUS 111 •••• •In <br />Mt ••II as IN NI II NI II • MI II NI SI IN II MI II II III MI II MI SI el III II MI IN In IN •• al wi • • is • <br />Ili <br />It 1=11 <br />14A6TV.24 <br />PeA2121 <br />21 CI <br />4,41,11C <br />sum, <br />40 <br />10 <br />20 <br />LET <br />IS <br />SUMP TEST SYSTEM <br />RECEPTACLES <br />FOR FOUR <br />SCREW•IN, PROBE <br />CABLE PLUGS <br />•••••. <br />POWER COFID <br />WITH A GROUNDED <br />3-PRONGED <br />PLUG <br /> <br />STS•PRB-12 <br />LEAK TESTING <br />PROBE WITH: <br />TSP-SSP <br />STAINLESS <br />STEEL FLOAT <br />TURBINE SUMP <br />WITH TEST SOLUTION <br />(Side View) <br /> <br />FIAT METAL <br />/ ANGLE IRON <br />REQUIRED <br />TO SUSPEND <br />PROBE <br />(SIDE VIEW) <br />SPLIT RING <br />Figure 1.3 Typical Leak Detection Probe — Turbine Sump Installation <br />Overview <br />r <br />Pg31 <br />Figure 1.4 Leak Detection Probe Installation <br />Turbine Sump <br />- • -