During June 1990, soil excavation was conducted in the former area of the two USTs <br /> Excavations were completed to 26 feet below grade at the former 10,000-gallon diesel tank, <br /> ' and 22 feet below grade at the location of the former 500-gallon waste-oil tank Excavation <br /> of impacted soil and construction of the on-site bioremediation treatment cell was <br /> conducted The excavation was backfilled with clean silty-sand from a local quarry, and <br /> capped with asphalt Approximately 3100 cubic yards of soil and associated material was <br /> disposed An additional 160 cubic yards was excavated and removed from the area of a <br /> fuel pipeline during the summer of 1991 As required by the CRWQC6, three dry <br /> monitoring wells were abandoned, and four new wells were installed during July 1990 <br /> In January 1994, the PHS/EHD defined a soil cleanup level of 100 ppm Quarterly <br /> groundwater monitoring was required until cleanup would be deemed complete On <br /> August 1, 1994, a Draft Amended Request for Closure was issued to PHS/EHD A five-year <br /> monitoring program followed by closure was suggested, with the condition that <br /> groundwater levels remain lower than 50 feet below surface level A Technical Evaluation <br /> was prepared by Dames & Moore in November 1994, which provided an assessment of soil <br /> remediation options <br /> In March 1995, the PHS/EHD required the continuation of quarterly water level monitoring, <br /> annual monitoring well sampling, and submittal of a work plan for the installation of a soil <br /> remediation option, as described in the Technical Report A soil and groundwater <br /> investigation was conducted in May 1995, and included the installation of two soil borings <br /> and one groundwater monitoring well In July 1995, Dames & Moore issued an Evaluation <br /> of Hydrocarbon Mobility report, which included an assessment of hydrocarbon mobility <br /> No further remedial action was recommended <br />' A five-year groundwater monitoring plan was submitted to the PHS/EHD in December <br /> 1995, which was approved by the PHS/EHD in March 1996 In August 1998, the PHS/EHD <br /> indicated that the five-year monitoring program was no longer a valid approach to closure, <br /> because rising groundwater levels might be approaching impacted soil Further <br /> investigation and documentation were required, including the installation of new <br /> monitoring wells, and quarterly groundwater monitoring for one year Two new wells were <br />' installed in December 1998, and quarterly monitoring was resumed <br />' 1 2 Purpose <br /> The purpose of this report is to document groundwater monitoring activities conducted at <br /> the Site during the third quarter of 2000 The primary objective of the monitoring is to <br /> 2 1 1AFPIREPOR71Q3-2000 DOC <br />