Laserfiche WebLink
Quarterly Groundwater Monitoring Report <br /> Second Quarter 2000 <br /> Former American Forest Products Stockton Facility <br /> Stockton, California <br /> TABLE OF CONTENTS <br /> Section Page <br /> 1 0 INTRODUCTION 1 <br /> 1 1 Background 1 <br /> 1 2 Purpose 2 <br /> 1 3 Scope of Work 3 <br /> 20 FIELD AND LABORATORY PROCEDURES 3 <br /> 2 1 Sampling Methods And Procedures 3 <br /> 2 2 Laboratory Procedures 4 <br /> 3 0 RESULTS AND DISCUSSION 4 <br /> 3 1 Data Validation 4 <br /> 3 2 Groundwater Levels 4 <br /> 3 3 TPH-D in Groundwater 4 <br /> 40 FUTURE ACTIVITIES 5 <br /> 1 <br /> LIST OF TABLES <br /> Table 1 — Monitoring Well Construction Data <br /> Table 2 — Groundwater Level Data <br /> Table 3 — Compilation of Groundwater Total Petroleum Hydrocarbon-Diesel Results <br /> LIST OF FIGURES <br /> Figure 1 — Site Location Map <br /> Figure 2 — Location of Monitoring Wells <br /> Figure 3 — Groundwater Contour Map (May 2000) <br /> LIST OF APPENDICES <br /> Appendix A Water Sampling Documentation <br /> Appendix B Laboratory Reports <br /> i <br /> Dames& Moore J 1AFPIREPORTIQ2-2000 DOC <br />