My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007959
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0007959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:43:03 PM
Creation date
6/18/2020 12:08:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007959
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />�qv <br /> Quarterly Groundwater Monitoring Report—June 1999 <br /> Former American Forest Products Stockton Facility <br /> Stockton, California <br /> 1 0 Introduction <br /> This report has been prepared by Dames & Moore on behalf of the former American Forest <br /> Products Company (AFPC), and presents the results of the third of four scheduled <br /> groundwater monitoring events at the former AFPC facility (Site) located at 2801 West Lane, <br /> I Stockton, California (Figure 1) This work has been conducted in response to a letter from <br /> the San Joaquin County Public Health Service-Environmental Health Division (PHS/EHD) <br /> dated August 3, 1998 <br /> 1 1.1 Purpose <br /> I The purpose of this report is to document groundwater monitoring activities conducted at <br /> the Site during June 1999 The primary objectives of the groundwater monitoring are to <br /> assess changes in groundwater levels and concentrations of Total Petroleum Hydrocarbons <br /> as Diesel (TPH-D) in groundwater at the Site <br /> 1.2 Scope of Work <br /> The scope of work for the second monitoring event included the following activities <br /> • Measurement of water levels at all seven monitoring wells, <br /> + Quarterly monitoring at monitoring wells DMW-6 and DM-7, <br /> • Analysis of groundwater samples for TPH-D, and <br /> • Preparation of a quarterly monitoring report <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> DAMES&MOORE 1 J 1AFPIREPORTl3QRPT DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.