My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008135
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:47:10 PM
Creation date
6/18/2020 12:08:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008135
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4* DAMES & MOORE <br /> 8801 FOLSOM BOULEVARD, SUITE 200, SACRAMENTO, CALIFORNIA 95826 <br /> �- (916) 387-8800 FAX (916) 387-0802 <br /> / November 1, 1994 <br /> Joaquin County Public Health Services <br /> nvironmentaI Health Division <br /> O Box 388 <br /> Stockton, California 95201-0388 <br /> Attention Mr Steve Sasson <br /> Re: Work Plan <br /> Former AFPC Facility <br /> Stockton, California <br /> Dear Steve <br /> On behalf of American Forest Products Company (AFPC), Dames & Moore is pleased to <br /> transmit this Work Plan for the installation of a soil boring and monitoring well program at the <br /> above-referenced site This Work PIan has been prepared in response to your August 29, 1994, <br /> letter to Mr Doug Westenhaver of AFPC requesting a work plan, a technical and an economic <br /> evaluation of further remedial action at the site <br /> This Work Plan proposes to advance a soil boring in close proximity to the former 500 gallon <br /> waste oil tank in order to obtain soil samples for TPH analysis Following soil sampling, a four-inch <br /> diameter monitoring well will be installed to supplement the monitoring well network at the site, and <br /> all five monitoring wells will be sampled <br /> The Work Plan is organized into 3 sections Section 10 presents the scope of work, with <br /> Section 2 0 describing field procedures and protocol followed by a proposed schedule in Section 3 0 <br /> i <br /> SAC128 18 <br /> OFFICES WORLDWIDE <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.