My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008135
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:47:10 PM
Creation date
6/18/2020 12:08:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008135
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL EVALUATION <br /> FORMER AFPC STOCKTON FACILITY <br /> STOCKTON, CALIFORNIA <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 10 INTRODUCTION 1 <br /> 11 PURPOSE I <br /> 1 2 REPORT ORGANIZATION 1 <br /> 20 BACKGROUND 2 <br /> 3 0 SCOPE OF WORK 4 <br /> 4 0 NATURE AND EXTENT OF CONTAMINATION 5 <br /> 4 1 SOIL 5 <br /> 4 2 GROUNDWATER 6 <br /> 5 0 TECHNOLOGY SCREENING AND DEVELOPMENT OF REMEDIAL OPTIONS 8 <br /> 5 1 GENERAL RESPONSE ACTIONS 8 <br /> 5 2 SCREENING OF TECHNOLOGY TYPES AND PROCESS OPTIONS 9 <br /> 5 2 1 No-Action 10 <br /> 5 2 2 Limited Action 10 <br /> 5 2 3 In-Situ Treatment 10 <br /> 5 2 4 Ex-Situ Treatm nt/Dis osal 11 <br /> 5 3 DEVELOPMENT OF REMEDIAL OPTIONS 12 <br /> 5 3 1 No-Action - Option 1 12 <br /> 5 3 2 Limited Action Groundwater Monitoring - Option 2 13 <br /> 5 3 3 Limited Action Groundwater Monitoring and Cap Maintenance - <br /> Option 3 14 <br /> 5 3 4 Bioventing - Option 4 14 <br /> 5 3 5 In-Situ Bioremediation - Option 5 16 <br /> 5 3 6 Excavation to Backzround Concentration and Off-Site Disposal - <br /> Option 6a 17 <br /> 5 3 7 Excavation to 1,000 mp-/kg m /kgandOff-Site Disposal - Option 6b 18 <br /> 5 3 8 Excavation to Background Concentration and, On-Site Thermal <br /> Treatment - Option 7a 18 <br /> 5 3 9 Ex avation to 1,000 mg/kg and On-Site Thermal Treatment - <br /> Ontion 7b 19 <br /> 6 0 EVALUATION OF REMEDIAL OPTIONS 21 <br /> 6 1 EVALUATION APPROACH AND DECISION CRITERIA 21 <br /> 6 2 REMEDIAL OPTION COST ESTIMATES AND NET PRESENT WORTH 23 <br /> 6 3 OVERALL SCORE AND RECOMMENDED REMEDIAL OPTION 25 <br /> SAC 127 10 i <br /> DAMES &.MOORE <br />
The URL can be used to link to this page
Your browser does not support the video tag.