My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008137
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 1:13:26 PM
Creation date
6/18/2020 12:09:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008137
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTRAL VALLEY REGIONAL WATER QUALITY CONTROL BOARD <br /> STAFF <br /> RECOMMENDATIONS <br /> FOR <br /> CLOSURE REQUESTS <br /> The Central Valley Underground Tank Program (Program) is implemented to <br />' achieve the goals of State policies, regulations, and procedures adopted by the State <br /> Water Resources Control Board and the Regional Board's Basin Plans To provide <br /> consistency in the Program, the Tri-Regional Board Staff Recommendations for <br /> Preliminary lnvestzgatzon and Evaluation of Underground Tank Sites and its <br /> Appendix A, both based on concepts originally developed in 1981 by the Central <br /> Vallev Regional Board staff, are revised periodically to accommodate statutory, <br /> regulation and policy changes Appendix A prescribes minimum report contents <br /> which are to be submitted for review and approval Appendix A streamlines the <br /> process for investigation and cleanup of sites to assure the discharger that the <br /> remediation system proposed is appropriate for the site subsurface conditions <br /> Appendix B for site closure has been developed to complete the documentation <br /> process Compliance with Regional Board's Appendix B is necessary before a request <br /> for closure may be submitted The request must include signatures of registered <br /> individuals as required by the California Business and Professions Code The <br />' purpose for a closure report is to provide a document upon which the regulator may <br /> make an objective decision regarding the requested closure The closure report and <br /> the Board's summary closure letter will remain on file in the Regional Board office <br /> for public review <br /> Central Valley Regional Board staff recognize that total cleanup of a site, although <br /> generally possible, is not always feasible or warranted ("site" includes on- and/or off- <br /> site problems resulting from the release of underground storage tank contents) <br />' Therefore, closure of a site may be unconditional if the site has been remediated <br /> successfully, or with conditions that "no further action is required at this time" when <br /> total cleanup can not be achieved Regardless of the action requested, a closure report <br /> is required for Regional Board review The closure report is to document whether <br /> complete remediation of the site has been achieved, or that a "no further action" <br /> closure of a site is warranted and that some soil or ground water contaminants will <br /> remain <br /> The report must discuss the site history, existing conditions, and rationale why the <br /> site may be closed with contamination remaining The rationale must include a <br /> tinding about future impacts on water quality and health The summary checklist is <br /> to be completed and submitted with the closure report by the Responsible Party(ies) or <br /> their designee If it has been determined that only soil has been impacted, evidence <br /> substantiating the condition must be submitted <br />
The URL can be used to link to this page
Your browser does not support the video tag.