Laserfiche WebLink
1 <br /> LIST OF TABLES,FIGURES AND APPENDICES <br /> LIST OF FIGURES <br /> Figure 11 Site Vicinity Map <br />' Figure 12 Site Map <br /> Figure 21 Soil Boring and Monitonng Well Locations <br /> Figure 3 1 Groundwater Elevation Contour Map, August 1, 1990 <br /> Figure 3 2 Groundwater Elevation Contour Map, December 5, 1990 <br /> Figure 3 3 Groundwater Elevation Contour Map, March 13, 1991 <br /> Figure 3 4 Groundwater Elevation Contour Map, July 31, 1991 <br /> Figure 41 Geologic Cross Sectional Area Map <br />' Figure 4 2 Geologic Cross Section A A' <br /> Figure 4.3 Geologic Cross Section B B' <br /> Figure 4,4 Confirming Soil TPH Diesel Analyses - Maintenance Shop Area <br /> Figure 4 5 Confirming Soil TPH Diesel Analyses - Pump Island Area <br />' LIST OF APPENDICES <br /> Appendix A Summary of Soil Analytical Results (1985, 1986) <br />' Appendix B Summary of Soil and Groundwater Monitoring Well Sample Analytical Results <br /> (1987) <br /> Appendix C Underground Storage Tank Removal (1988) <br /> Appendix D Summary of Soil and Groundwater Monitoring Well Sample Analytical Results <br /> (1988) <br /> Appendix E Letter Report Groundwater Monitoring American Moulding and Millwork (1989) <br /> Appendix F RWQCB Comments on Previous Investigations (1990) <br />' Appendix G Lithologic logs of soil borings and well completion data (1990) <br /> Appendix H Groundwater Monitoring Well Sample Analytical Results (1990, 1991) <br /> Appendix I Construction Supervisors Notes - Maintenance Shop Demolition, Excavation, <br />' Recompaction, Repavement, Biotreatment Cell Construction <br /> Appendix J Confirmatory Soil Analyses from Excavation (1990) <br /> Appendix K Application to Dispose Non-Hazardous Soil (1990) <br />' Appendix L Bills of Lading for Transporting Non-Hazardous Soil (1990, 1991) <br /> Appendix M Underground Piping/Pump Island Confirmatory Soil Sampling (1991) <br /> SAC36 046 li <br /> DAMES & MOORE <br />