My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008212
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:30:12 PM
Creation date
6/18/2020 12:15:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008212
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ANNUAL REPORT <br /> 1996 GROUNDWATER MONITORING <br />' FORMER AMERICAN FOREST PRODUCTS COMPANY FACILITY <br /> STOCKTON, CALIFORNIA <br /> 1 0 INTRODUCTION <br /> This report, prepared on behalf of American Forest Products Company (AFPC), presents <br />' the results for the 1996 groundwater monitoring performed at the former AFPC facility in <br /> Stockton, California (Site) Annual and semi-annual monitoring is being performed at the Site <br /> in accordance with Dames & Moore's Proposed Monitoring Program dated December 15, <br /> 1995 This proposed monitoring program was confirmed in correspondence dated April 17, <br /> 1996 between Kirkland & Ellis and the San Joaquin County Public Health Services <br /> Environmental Health Division (PHS/EHD) <br />' The monitoring program outlines two tasks These tasks include semi-annual <br /> groundwater level measurements and annual groundwater sampling from five existing on-Site <br /> monitoring wells The results of this report demonstrate that the groundwater monitoring <br /> program, agreed to by PHS/EHD and AFPC, has been implemented <br /> The report has been partitioned into three sections and three appendices Section 1 0 <br /> presents this introduction Section 2 0 discusses groundwater sampling methods and <br /> analytical results, and Section 3 0 offers a summary of the data Appendix A describes the <br /> groundwater sampling protocol utilized during the sampling round Appendix B presents Field <br /> Record of Water Sample and Chain-of-Custody forms Appendix C presents the Analytical <br /> Laboratory Summary Report, and a memorandum summarizing data validation <br /> 2.0 GROUNDWATER SAMPLING AND ANALYTICAL RESULTS <br />' The groundwater monitoring program includes the measurement of groundwater levels <br /> and the collection of groundwater samples from five Site monitoring wells, DMW-1 through <br />' DMW-5 Per the approved program, the depth to groundwater is to be measured semi- <br /> annually (January and July), and groundwater sample collection is to be performed annually <br />' (July) The 1996 groundwater monitoring is the first round to have been performed since <br /> implementation of this monitoring program Future rounds will be conducted in accordance <br /> with this schedule The sections below discuss the sampling and analytical methods <br /> R\SAC1044MISC19610 04 WPD 1 <br /> DAMES & MOORE <br />
The URL can be used to link to this page
Your browser does not support the video tag.