Laserfiche WebLink
November 1, 1994 <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> P O Box 388 <br /> Stockton, California 95201-0388 <br /> Attention Mr Steve Sasson <br /> Re: Work PIan <br /> Former AFPC Facility <br /> Stockton.California <br /> Dear Steve <br /> On behalf of American Forest Products Company (AFPC), Dames & Moore is pleased to <br /> transmit this Work Plan for the installation of a soil boring and monitoring well program at the <br /> above-referenced site This Work Pian has been prepared in response to your August 29, 1994, <br /> letter to Mr Doug Westenhaver of AFPC requesting a work plan, a technical and an economic <br /> ievaluation of further remedial action at the site <br /> This Work Plan proposes to advance a soil boring in close proximity to the former 500 gallon <br /> waste oil tank in order to obtain soil samples for TPH analysis Following soil sampling, a four-inch <br /> diameter monitoring well will be installed to supplement the monitoring well network at the site, and <br /> all five monitoring wells will be sampled <br /> The Work Plan is organized into 3 sections Section 1 0 presents the scope of work, with <br /> Section 2 0 describing field procedures and protocol followed by a proposed schedule in Section 3 0 <br /> SAC 128 18 <br />