My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008213
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:53:26 PM
Creation date
6/18/2020 12:16:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008213
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County Public Health Services <br /> Environmental Health Division <br /> November 1, 1994 <br /> Page 7 <br /> measured using a calibrated container and will contain not more than seven gallons of water per bag <br /> of cement The grout will be placed by tremmie method The well casing will be cut-off dust below <br /> ground surface, fitted with an air-tight cap, and enclosed in a steel sleeve with a locking lid The <br /> locking steel sleeves will be encased in a water-tight metal vault box with a lid and finished with <br /> concrete a few inches higher than the surrounding land surface to route any surface runoff away from <br /> the well The well elevation and locations will be surveyed by a California licensed surveyor The <br /> surveyed elevation will be recorded on the final boring log <br /> Well Development <br /> Approximately 24 hours after completion of well construction the well will be developed <br /> Remove fine-grained sediment from the well casing and the filter pack surrounding the screen such <br /> that water produced by the well is relatively sediment-free Development will be performed by <br /> surging with a surge block and either pumping with a submersible pump or bailing with a stainless <br /> steel bailer <br /> A minimum of 10 casing volumes of water will be removed from the well during <br /> development If, when 10 volumes have been removed, the produced water still contains sediment, <br /> development will continue until relatively sediment-free water is produced or to a point at which <br /> water clarity cannot be improved If relatively sediment-free water is produced prior to removing <br /> 10 volumes from the well, development will continue until the 10 casing volume mark is attained <br /> A well development log will be maintained by the Dames & Moore Geologist Development water <br /> will be contained in 55-gallon barrels and stored on-site until analytical results are received <br /> 2 3 Groundwater Sampling Procedures <br /> Following development of the new monitoring well, groundwater samples will be collected <br /> from the five monitoring wells in accordance with applicable sampling protocols, details of which <br /> are presented below in the following sections <br /> sAC128 18 Page-7 DAMES & MooRE <br />
The URL can be used to link to this page
Your browser does not support the video tag.