Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM(Page 1 of 1) <br /> Type of Action ❑Installation Test ❑Repair Test ❑x 12 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 10181611 5/7/2020 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> JAHANT FOOD & FUEL <br /> Business Site Address City ZIP Code <br /> 24323 N. HIGHWAY 99 1ACAMP0, CA 95220 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the ICC Certification.) Phone# <br /> ZANE NIMMO (209) 744-0112 <br /> Contractor I Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 04-1676 Ex. 3/31/22 8883064-UT 6/1/2021 <br /> Spill Container Testing Training and Certifications(List applicable certifications.) <br /> Franklin Fueling - EBW&Phil Tite #10009843708 Ex.11/29/2020 <br /> OPW#104-632 Ex. 3/17/2022 <br /> III. SPILL CONTAINER TESTING INFORMATION <br /> Test Method Used: ❑x Manufacturer Guidelines(Specify): O P W PHASE I LAKE TESTING <br /> ❑Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> TANK ID:(By tank number,stored product,etc.) 1 - 87 OCT 2 - 89 OCT 3 - 91 OCT 4 - DIESEL <br /> Spill Container Manufacturer: O P W O P W O P W O P W <br /> Method of Cathodic Protection: ❑x Non-Metallic ❑x Non-Metallic ❑x Non-Metallic ❑x Non-Metallic <br /> ❑Isolation ❑Isolation ❑Isolation ❑Isolation <br /> ❑Other(Specify in V.) ❑Other(Specify in V.) ❑Other(Specify in V.) ❑Other(Specify in V) <br /> Inside Diameter of Spill Container:(Inches) 11 11 11 11 <br /> Depth of Spill Container:(Inches) 12 1/4 13 1/2 14 1/8 12 - <br /> Does the spill container have a 5 gallon capacity? 2 Yes ❑No 0 Yes ❑No 0 Yes ❑No 2 Yes ❑No <br /> Method to Keep Spill Container Empty: ❑x Drain Valve ❑x Drain Valve ❑x Drain Valve ❑x Drain Valve <br /> ❑Onsite Pump ❑Onsite Pump ❑Onsite Pump ❑Onsite Pump <br /> ❑Other(Specify in V.) ❑Other(Specify in V.) ❑Other(Specify in V) ❑Other(Specify in V) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results: ❑x Pass ❑Fail ❑x Pass ❑Fail 11 ❑x Pass ❑ Fail ❑x Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked"Fail'above must be explained in this section. Any additional comments may also be provided here. <br /> rrn+a:t 7 <br /> REQ {� <br /> d <br /> MAY 1 8 2020 <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> hereby certify that the spill containers were tested in accordance with California Code of Regulations, Title 23, Division 3, <br /> Chapter 16,Section 2637.1 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates,additional copies of this page maybe attached. <br /> CERS=Califomia Environmental Reporting System,ID=Identification,UST=Underground Storage Tank,ICC=Intemational Code Council <br />