My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24323
>
2300 - Underground Storage Tank Program
>
PR0231947
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:16 PM
Creation date
6/18/2020 2:13:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231947
PE
2361
FACILITY_ID
FA0004345
FACILITY_NAME
JAHANT FOOD N FUEL STOP
STREET_NUMBER
24323
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00516019
CURRENT_STATUS
01
SITE_LOCATION
24323 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORAGETANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page a of s) <br /> XIII. VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> A ❑ 1 B ❑ I C ❑ D <br /> A ❑ I B I C I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Vapor Recovery Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Interstitial Communication Verification Method Used: <br /> NA-Section III-No Vapor Recovery Piping Containment at this UST Facility. <br /> XIV. COMMENTS <br /> Provide any additional comments here. <br /> NA-Section III-No Vapor Recovery Piping Containment at this UST Facility. <br /> NA-Section III-No Vapor Recovery Piping or Vapor Recovery Piping Containment for Tank A-Diesel. <br /> XV. TURBINE/PRODUCT PIPING SUMP TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Unknown Fiberglass A ❑x I B ❑x C ❑x D ❑x <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑ Industry Code or Engineering Standard(Specify): <br /> X Engineered Method(Specify): Caldwell Systems/Hydrostatic 30 Minutes <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Turbine/Product Piping Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Caldwell Level Change Indicator 6/10/2023 <br /> ICC Service Technician #5246802-UT 3/21/2021 <br /> Underground Storage Tank Tester License #90-1120 12/31/2022 <br /> XVI. COMMENTS <br /> Provide any additional comments here. <br /> ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.