Laserfiche WebLink
Log of Boring B3 <br /> Project: Trucking Facility Project No: 012-19059 <br /> Client: Newport Carriers, Inc. Figure No.: A-3 <br /> Location: EI Dorado Street and French Camp Road, French Camp, California Logged By: Wayne Andrade <br /> Depth to Water> Initial: 23 Feet At Completion: 171/4Feet <br /> SUBSURFACE PROFILE SAMPLE <br /> Penetration Test <br /> U blows/ft <br /> Water Content(%) <br /> Description <br /> y <br /> C 2 <br /> t ,p � 3 <br /> E Z a 20 40 60 10 20 30 40 <br /> � cn ❑ � � m <br /> 109.5 16.0 28 ■ <br /> 42 3. <br /> 44 <br /> 108.0 16.1 29 ■ <br /> 46 <br /> �i <br /> t'r <br /> 48 <br /> F � I <br /> 50 <br /> End of Borehole <br /> 52 <br /> 54 <br /> 56 <br /> 58- <br /> 60 <br /> Drill Method: Hollow Stem Drill Date: 4-23-19 <br /> Drill Rig: CME 45C-1 Krazan and Associates Hole Size: 6'/2 Inches <br /> Driller: Chris Wyneken Elevation: 50 Feet <br /> Sheet: 3 of 3 <br />