Laserfiche WebLink
WELLS FARGO BANK PROPERTY REVISED <br /> 49 SOUTH WILSON WAY PRIVILEGED&CONFIDENTIAL <br /> STOCKTON, CALIFORNIA <br /> MAY 3, 1999 <br /> Page 3 <br /> September and October 1997, Additional Phase II Subsurface Investigation and <br /> Quarterly Monitoring <br /> Building Analytics completed an additional Phase 11 Subsurface Investigation and <br /> Quarterly Groundwater Monitoring in September and October 1997, which included the <br /> installation of one additional 80-foot deep soil boring and groundwater monitoring well <br /> (in the area of well MW-2), and the monitoring and sampling of the one new and three <br /> existing groundwater monitoring wells. The following is a summary of the findings from <br /> the investigation and monitoring event: <br /> • The groundwater flow direction was measured to be to the northeast with a <br /> hydraulic gradient of 0.0055; <br /> .� • TPH-g at concentrations of up to 75 ppm was reported in the soil samples <br /> collected from Boring B4, at depths between 35 and 45 feet bgs; <br /> • Benzene at concentrations of up to 0.057 ppm was reported in the soil samples <br /> collected from Boring B4, at a depth of approximately 45 feet bgs; <br /> • TPH-g and BTEX were not reported in groundwater samples collected from <br /> monitoring wells MW-1 or MW-3; <br /> • TPH-g was reported in the groundwater samples collected from MW-2 and MW-4 <br /> at concentrations of up to 3.4 ppm; <br /> • TPH (Carbon Range C8-C44+) was also reported in the groundwater sample <br /> collected from MW-2, at a concentration of 2.3 ppm; <br /> • Benzene was reported in the groundwater samples collected from MW-2 and <br /> MW-4 at concentrations of 1.2 parts per billion (ppb) and 11 ppb, respectively; <br /> and <br /> • MTBE was not reported in the soil or groundwater samples collected. <br /> w <br /> May 1997, Work Plan - Additional Phase II Subsurface Investigation <br /> Subsequent to the September 1997 Additional Phase II Subsurface Investigation, the <br /> SJCEHD requested that an additional soil boring be installed down-gradient from <br /> groundwater monitoring wells MW-2 and MW-4. Building Analytics submitted a Work <br /> Plan for the Additional Soil Boring and Quarterly Groundwater Monitoring to the <br /> SJCEHD on May 4, 1997, which was approved with comments on January 20, 1998. <br /> Final approval was issued after the SJCEHD received reports from adjacent LUST sites <br /> on July 20, 1998. <br /> October 1998, Additional Phase II Subsurface Investigation and Quarterly <br /> Monitoring <br /> ' In August 1998, Building Analytics completed an additional Phase II Subsurface <br /> Investigation and Quarterly Groundwater Monitoring, which included the installation of <br /> one additional 80-foot deep soil boring, and the monitoring and sampling of the four <br />