My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 9:28:47 AM
Creation date
6/18/2020 4:30:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page 4 of s) <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? Q ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, El El <br /> tested,and confirmed operational? <br /> 19 Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with 19 El El <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? 0 ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected,functionally tested,and confirmed operational? X ❑ 1 ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑X ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically E] E]disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br /> Which sensors initiate positive shut down? (Check all that apply.) ❑X Sump ❑X Under-Dispenser Containment ❑ ❑ <br /> If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? ❑ ❑ I ❑x <br /> For any answer of"N"above,describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> ❑X Check this box if tank gauging is used only for inventory control.(Do not complete this section.) <br /> ❑Check this box if NO tank gauging equipment is installed.(Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring, <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for El El 1:1round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely,functionally ❑ 11 1:1tested,and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ 1 ❑ 1 ❑ <br /> For any answer of"M'above,describe in Section XI how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> Y=Yes,N=No,NA=Not Applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.