My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
8960
>
2900 - Site Mitigation Program
>
PR0506456
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 7:56:02 AM
Creation date
6/22/2020 7:47:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506456
PE
2950
FACILITY_ID
FA0007437
FACILITY_NAME
M & K GAS STATION
STREET_NUMBER
8960
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115029
CURRENT_STATUS
02
SITE_LOCATION
8960 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Water Resources <br /> Control Board <br /> Division of Clean Water Programs ' <br /> 2014 T Street•Sacramento,California 95814•(916)227-4411 li <br /> Winston H. HiCkox Mailing Address: P.O.Box 944212•Sacramento,California•94244 20��1 2; 4 1 Gray llavis <br /> Secretaryfor FAX(916)227-4530•Internet Address: http://www.swrcb.c;Pavq4liome/ustcf Governor <br /> Environmental <br /> Proteclion <br /> I <br /> '1 <br /> July 16, 1999 <br /> �I <br /> Marla Nahorn/Enviromental Closures, Inc. <br /> Douglas Manser <br /> 7574 Shoreline Dr <br /> Stockton, CA 95219 <br /> 4 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND PROGRAM,NOTICE OF ELIGIBILITY J� <br /> DETERMINATION: CLAIM NUMBER-014437; FOR SITE ADDRESS: 8960 WALNUT GROVE RD <br /> W,THORNTON <br /> Your claim has been accepted for placement on the Priority List in Priority Class "B"with a deductible II <br /> of$5,000. <br /> We have completed our initial review. The next step in the claim review process is to conduct a <br /> compliance review. <br /> Comyliance Review: Staff reviews, verifies, and processes claims based on the priority and rank within <br /> a priority class. After the Board adopts the Priority List,your claim will remain on the Priority List until <br /> your Priority Class and rank are reached. At that time, staff will conduct an extensive Compliance <br /> Review at the local regulatory agency or Regional Water Quality Control Board. During this <br /> Compliance Review, staff may request additional information needed to verify eligibility. Once the ! <br /> Compliance Review is completed, staff will determine if the claim is valid or must be rejected. If the i! <br /> claim is valid, a Letter of Commitment will be issued obligating funds toward the cleanup. If staff i <br /> determine that you have not complied with regulations governing site cleanup,you have not supplied <br /> necessary information or documentation, or your claim application contains a material error, the claim l <br /> will be rejected. In such event, you will be issued a Notice of Intended Removal from the Priority List, <br /> informed of the basis for the proposed removal of your claim, and provided an opportunity to correct the I <br /> condition that is the basis for the proposed removal. Your claim will be barred from further participation i <br /> in the.Fund, if the.claim application contains a material error-resulting from Eaud or-intentional or �k - <br /> negligent misrepresentation. <br /> Record keeping: During your cleanup project you should keep complete and well organized records of <br /> all corrective action activity and payment transactions. If you are eventually issued a Letter of <br /> Commitment, you will be required to submit: (1)copies of detailed invoices for all corrective action <br /> activity performed(including subcontractor invoices), (2)copies of canceled checks used to pay for work <br /> shown on the invoices, (3) copies of technical documents(bids,narrative work description,reports), and <br /> (4) evidence that the claimant paid for the work performed (not paid by another party). These documents <br /> are necessary for reimbursement and failure to submit them could impact the amount of reimbursement <br /> made by the Fund: It is not necessary to submit these documents at this time,however, they will <br /> definitely be required prior to reimbursement <br /> Compliance with Corrective Action Requirements: In order to be reimbursed for your eligible costs of <br /> cleanup incurred after December 2, 1991, you must have complied with corrective action requirements of <br /> California Environmental Protection Agency q <br /> �t1► Recycled Paper �I <br />
The URL can be used to link to this page
Your browser does not support the video tag.