My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
8960
>
2900 - Site Mitigation Program
>
PR0506456
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 7:56:02 AM
Creation date
6/22/2020 7:47:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506456
PE
2950
FACILITY_ID
FA0007437
FACILITY_NAME
M & K GAS STATION
STREET_NUMBER
8960
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115029
CURRENT_STATUS
02
SITE_LOCATION
8960 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> Douglas Manser -2- February 28, 2000 <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre-Approved Comments <br /> 1. Workplan Addendum, Site 0 Tasks already completed. <br /> Safety Plan <br /> 2. Excavate approximately 1100 $53,328 Includes backfill, compaction and lab <br /> c.y. clean and 1300 c.y. analyses. <br /> contaminated soil <br /> 3. Pump, treat,remove $14,510 Includes aeration. <br /> 4 . 'approximately 40,000 gallons of~ - <br /> oundwater <br /> 4. Sample &profile stockpiled soil $11,264 <br /> 5. Report preparation& submittal $2,400 Costs will be evaluated at time of <br /> reimbursement request based on the <br /> actual report submitted. <br /> TOTAL PRE-APPROVED $81.,502 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it <br /> to remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • Due to the necessity for an expedited implementation of the workplan, the three-bid <br /> requirement is waived for this scope of work only. <br />�-� - • If a different scope of work becomes necessary, then-you must-request-pre-approval of costs on the new scope of work. <br /> • Although I have referred to the Ground Zero Analysis, Inc. proposal in my pre-approval <br /> above, please be aware that you will be entering into a private contract: the State of <br /> California cannot compel you to sign any specific contract. This letter pre-approves the <br /> costs as presented in the proposal dated February 14, 2000 by Ground Zero Analysis, Inc. for <br /> conducting the work approved by the County for implementing the February 15, 2000, <br /> Ground Zero Analysis, Inc. workplan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary corrective action work. <br /> The legislation governing the Fund requires that the Fund assist you in procuring contractor and <br /> California En vironmental Protection Agency <br /> Zd Recyded Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.