Laserfiche WebLink
u <br /> !! <br /> Mr. Harlin Knoll <br /> Page 3 of 3 <br /> ji. <br /> If pressure drops, additional cement will be emplaced at the surface and pressure reapplied until appropriate <br /> stabilization is achieved. Because the annular seals in these wells are shallow, the uppermost five feet will <br /> not be overdrilled. <br /> Reporting <br /> Following the receipt of analytical data, Ground Zero will pre are a technical report describing field activities, <br /> results, conclusions, and recommendations for submittal to ERD and the California Regional Water Quality <br /> Control Board(CRWQCB). <br /> Protocols and Safety <br /> ii <br /> All field activities performed at the site will be conducted in accordance with Ground Zero's Quality <br /> Assurance/Quality Control Plan and Site Specific Site Safety Plan on file with EHD. Drill cuttings and rinsate <br /> generated from well purging and equipment decontamination will be properly contained and stored on sits <br /> pending laboratory results and the development of disposal options. <br /> Permitting <br /> A well destruction permit application and associated fees wil be submitted upon approval of this workplan..) <br /> Please contact Ground Zero at your earliest convenience if you have any questions or comments regarding this <br /> report. <br /> i <br /> 'I <br /> Respectfully, <br /> Gro odalysis Inc. <br /> Sen , XPIN P. <br /> f <br /> Staff Geologist 11NE <br /> N0. 6795 ' <br /> John P. Lane <br /> CA Registered Geologist 6795 �` QP C)Ak <br /> d <br /> cc: Mr. James L.L. Barton,RWQCB <br /> Mr. Patrick D.Riddle,Attorney at Law !� <br /> Mr. Art Wyatt, Barnyard Corporation <br /> 4 <br /> r: <br /> I' <br /> G:IGROUNDZE1Barnyard-Manser\Reports\WKPLAN_DESTROY_MWI -MW7.d c !; <br />