Laserfiche WebLink
• 11 + <br /> WORK REQUEST FORM <br /> Date of Request 01/05/04 Requested Completion Date 01/06/04 <br /> Prod Name Barnyard Corporation Prod No 444 <br /> i <br /> Site Address 8960 W Walnut Grove Road Thornton CA Task none <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Pat Riddle/Marla Phone No 367-6992 <br /> Regulatory Contact Harlin Knoll Phone No 468-3442 <br /> Tenant Contact Karen at Ramos Oil Phone No 916-777-5545/916-997-6823 cell/8008792570 office <br /> Approval 61 �oS Completion Date <br /> READ AND UNDERSTAND THIS WORK REQUEST PRIOR TO ARRIVING ON SITE <br /> Karen of Ramos Oil will unlock the gate furthest from the freeway at 8.00 am <br /> The scope of work will consist of purging and sa=lurig seven 2-inch wells Chemical hazard is <br /> primarily MTBE max 86 b lastquarter) Items to bring to site include centrifugal pump and <br /> tubing, bailers sample bailers water level probe and field meters ice chest with ice <br /> Measure DTW/DTB in each site well MW I-MW7 DTW should be a roximatel 6-9 feet <br /> below ground surface Order is MW7 MW6 MW2 MWI- MW5 MW4 MW3 <br /> Sample wells in order The order is MW7 MW6 MW2 MW1 MWS MW4 MW3 Wells are <br /> 2-inch diameter and approximately 19-24 feet b s Measure water arameters H conductive <br /> tem Make sure you follow our decon protocols. all downhole equipment between wells <br /> Wells 1 2,41 5 6 and 7 all had MTBE below the secondga MCL of 5 0 ppb and well MW3 <br /> were mildly impacted You should store water from well MW3 separate from all the rest <br /> Sample all wells for TPH /BTEX using EPA 8015B and oxygenates plus EDB and 1,2-DCA <br /> using EPA 8260B Send samples to Argon Labs for analysis Note on C O C that EDF is <br /> required-and detection Iimit of 0 5 is required <br /> Take a detailed drum count of all soil and water filled drums Make sure all drums are labeled <br /> Be sure to lock the gate when you leave the site <br />