My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008784
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
8960
>
2900 - Site Mitigation Program
>
PR0506456
>
ARCHIVED REPORTS_XR0008784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:22:27 AM
Creation date
6/22/2020 7:53:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008784
RECORD_ID
PR0506456
PE
2950
FACILITY_ID
FA0007437
FACILITY_NAME
M & K GAS STATION
STREET_NUMBER
8960
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115029
CURRENT_STATUS
02
SITE_LOCATION
8960 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK REQUEST FORM <br /> Date of Request 12/04/02 Requested Completion Date 12/05/02 <br /> Prod Name Barnyard Corporation Prot No 444 <br /> Site Address 8960 W Walnut Grove Road, Thornton, CA Task none <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Pat Riddle/Marla Phone No 367-6992 <br /> Regulatory Contact Harlin Knoll Phone No 468-3442 <br /> Tenant Contact Karen at Ramos Oil Phone No 916-777-5545/916-997-6823 cell <br /> 18008792570 office f 1 <br /> Approval �� �` l �Z Completion Date A C <br /> READ AND UNDERSTAND THIS WORK REQUEST PRIOR TO ARRIVING ON SITE <br /> Karen of Ramos Oil will unlock the gate furthest from the freeway between 8:00-8:30 am. <br /> The scope of work will consist of purging and sampling seven 2-inch wells Chemical hazard is <br /> primarily MTBE max 220 VVb lastquarter) Items to bring to site include centrifugal pump and <br /> tubin sure block bailers sample bailers water level probe and field meters ice chest with ice <br /> 2 drums <br /> Measure DTW/DTB in each site well (MWI-MW7) DTW should be approximately 7 5-9 feet <br /> below ground surface Order is MW2, MW6, MW7, MW5; MWI, MW4, MW3 <br /> Develop and sample new wells in order The order is MW2, MW6, MW7, MW5, NMI, MW4, <br /> MW3 Wells are 2-mch diameter and approximately 19 feet b s Measure water parametersIpH <br /> conductivity, temp ) Make sure you follow our decors protocols, all downhole equipment <br /> between wells Wells MW2, MW6,_and MW7 were ND and wells MW 1, MW3, MW4, and MW5 <br /> were mildly impacted You can discharge previous_water from wells 2,6,7 1f 1t. was stored <br /> separate from all others and reuse drum You can store water from clean wells in one drum and <br /> water from impacted wells in second drum <br /> Sample all wells for BTEX and oxygenates, EDB, 1,2-DCA, ethanol, methanol using EPA <br /> 8260B Send samples to Argon Labs for analysis Note on C O C that EDF is required <br /> Take a detailed drum count of all soil and water filled drums Make sure all drums are labeled <br /> Be sure to lock the gate when you leave the site <br /> so 45e-c r2 ![ <br /> � l <br />
The URL can be used to link to this page
Your browser does not support the video tag.