My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008810
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
8960
>
2900 - Site Mitigation Program
>
PR0506456
>
ARCHIVED REPORTS_XR0008810
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:07:24 AM
Creation date
6/22/2020 8:02:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008810
RECORD_ID
PR0506456
PE
2950
FACILITY_ID
FA0007437
FACILITY_NAME
M & K GAS STATION
STREET_NUMBER
8960
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115029
CURRENT_STATUS
02
SITE_LOCATION
8960 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CHECKLIST OF REQUIRED DATA FOR NO FURTHER ACTION REQUESTS AT <br /> UNDERGROUND TANK SITES <br /> • Barnyard Site, 8960 W Walnut Grove Rd, Thornton, CA <br /> Page 3 <br /> Approximately 60,000 gallons of impacted groundwater were removed from the excavation <br /> pit during interim remediation activities Analysis of the groundwater prior to removal <br /> indicated that approximately 160 pounds of gasoline, 23 pounds of diesel, 1 pound of <br /> benzene, 2 6 pounds of toluene, 2 4 pounds of ethylbenzene, 1 4 pounds of xylenes, and 1 8 <br /> pounds of MTBE were removed by groundwater extraction and off-site disposal Based on <br /> groundwater analytical results from recent sampling of the monitoring wells, it is estimated <br /> that less than 0 2 pounds of MTBE remains in groundwater at the site No other VOCs have <br /> been detected in any well (Attachment D) <br /> 14 Assumptions, parameters, calculations and model used in risk assessment and fate and <br /> transport modeling Not Applicable <br /> 15 Rationale why conditions remaining at site will not adversely impact water quality, health or <br /> other beneficial uses <br /> • Primary and secondary contamination sources have been removed in the form of UST <br /> removal, interim groundwater extraction, and overexcavation, respectively <br /> • The minor mass of residual contamination in the soil is not expected to significantly affect <br /> groundwater <br /> • Petroleum hydrocarbons have never been detected in any site well <br /> • Dissolved concentrations of MTBE at the site continue to decrease All perimeter wells <br /> are below applicable primary and secondary MCLS Only well MW3 (100 ppb), which <br /> is located in the former excavation, contains concentrations of MTBE at levels <br /> exceeding the primary (13 ppb) and secondary (5 0 ppb) MCLs The most recent <br /> isoconcentration map for MTBE is included in Attachment D <br /> • Natural attenuation processes will continue to degrade the residual contaminants to non- <br /> detectable concentrations <br /> 16 WET or TCLP results Not analyzed <br /> appB_cklist doe 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.