My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008811
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
8960
>
2900 - Site Mitigation Program
>
PR0506456
>
ARCHIVED REPORTS_XR0008811
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:05:27 AM
Creation date
6/22/2020 8:02:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008811
RECORD_ID
PR0506456
PE
2950
FACILITY_ID
FA0007437
FACILITY_NAME
M & K GAS STATION
STREET_NUMBER
8960
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115029
CURRENT_STATUS
02
SITE_LOCATION
8960 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ri <br /> WORK REQUEST FORM <br /> Date of Request 6/25/03 Requested Completion Date 6/26103 <br /> Prod Name Barnyard Co poration Prod No 444 <br /> Site Address 8960 W Walnut Grove Road, Thornton CA Task none <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Pat Riddle/Maria Phone No 367-6992 <br /> Regulatory Contact Harlin Knoll Phone No 468-3442 <br /> Tenant Contact Karen at Ramos Oil Phone No 9I6-777-5545/916-997-6823 cell/8008792-;70 office <br /> Approval �Z� ts2 ��� S _Completion Date n b/)�_b/o <br /> , <br /> READ AND UNDERSTAND THIS WORK REQUEST PRIOR TO ARRIVING ON SITE <br /> Karen of Ramos Oil will unlock the gate furthest from the freeway at 8:00 am <br /> The scope of work will consist of purging and sampling seven 2-inch wells Chemical hazard is <br /> nmanly MTBE max 240 ppb Iastquarter) Items to bring to site include centrifugal pump and <br /> tubing bailers sample bailers water level robe and field meters. ice chest with ice <br /> Measure DTW/DTB in each site well MWI-MW7 DTW should be an roximately 7 5-9 feet <br /> below ground surface Order is MW2 MW6 MW7 MW5 MW1 MW4 MW3 <br /> Sample new wells in order The order is MW2, MW6. MW7. MW5 MW 1 MW4 MW3 Wells <br /> are 2-inch diameter and approximately 19-24 feet b s Measure water parameters H <br /> conductivitv temp Make sure you follow our decon protocols. all downhole equipment <br /> between wells Wells MW I. MW2. MW6, and MW7 were ND and wells MW3 MW4 and <br /> MWS were mildly impacted You can dizchar e previous water from wells 12.6 7 if it was <br /> stored separate from all others and reuse drum You can store water from clean wells in one <br /> drum and water from iml2acted wells in second drum I believe all drums have been emptied <br /> since last sampling <br /> Sample all wells for BTEX and oxv2enate3 EDB_ 1,2-DCA. using EPA 8260B Send samples to <br /> Argon Labs for analysis Note on C O C that EDF is required <br /> Take a detailed drum count of all soil and water filled drums Make sure all drums are labeled <br /> Be sure to lock the gate when you leave the site <br />
The URL can be used to link to this page
Your browser does not support the video tag.