My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2040
>
2900 - Site Mitigation Program
>
PR0506560
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:27:10 AM
Creation date
6/22/2020 8:11:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506560
PE
2960
FACILITY_ID
FA0004535
FACILITY_NAME
CAL-FARM SUPPLY
STREET_NUMBER
2040
Direction
W
STREET_NAME
WASHINGTON
City
STOCKTON
Zip
95206
APN
14503004
CURRENT_STATUS
01
SITE_LOCATION
2040 W WASHINGTON
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Procedures for Installation of Deep Monitoring Well (MW-7) <br /> Cal-Farm Supply Company Stockton, California <br /> Monitoring Well MW-7 will be installed to a depth of approximately 35-feet below ground <br /> surface (bgs)to assess the groundwater quality in the deeper water bearing zone. A conductor <br /> casing will be installed for this well to prevent cross contamination from the upper to the lower <br /> water bearing zone. Drilling will be performed by V & W Drilling (license no. 720904) and <br /> supervised by an IT state certified geologist. <br /> A fifteen inch diameter borehole will be drilled to the depth of the confining layer(anticipated to <br /> occur at 30 feet bgs). An 8-inch ID steel casing will be set and centralized in the boring and <br /> pushed approximately one foot into the confining layer. Cement/bentonite grout will be placed <br /> in the annular space between the casing and the bore wall. The cement will be allowed to cure <br /> overnight. <br /> The following day, an 8-inch boring will be advanced by hollow stem auger through the inside <br /> of the steel casing into the next deeper aquifer. A 2-inch well will be installed to monitor water <br /> quality in the deeper aquifer. All drilling equipment will be steamed cleaned prior to use. <br /> Drilling and well installation information will be recorded on a boring log by the IT geologist <br />
The URL can be used to link to this page
Your browser does not support the video tag.