Laserfiche WebLink
California Renal Water Quality Control Board <br /> vCentral Valley Region <br /> Winston H.Hickox Robert Schneider,Chair <br /> Gray Davis <br /> Secretaryfar Sacramento Main Office Governor <br /> Environmental Internet Address: htlp://www.sweb.ca.gov/mgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> Mr. Arnold Hof 31 January 2002 <br /> 28537 E. River Road �T% <br /> Escalon, CA 95320 <br /> DELINQUENT WORKPLAN, FORMER CAL FARMSUPPLY, 2040 W. WASHINGT011� E �*` .>l \ <br /> STO CKTON, SAN JOA Q UIN CO UNTY 0'L° j�, <br /> When we met on 23 October 2001, you agreed to do the following: <br /> • Install a replacement monitoring well along the southern boundary of your property, <br /> • Sample all of the monitoring wells in the fall of 2001, <br /> • Sign and return the cost acknowledgement form, and <br /> • Plant trees along the eastern and western property boundaries. <br /> In our 12 December 2001 telephone conversation, you stated that you received the cost <br /> acknowledgement form we sent and that you would be selecting a consultant shortly. More than three <br /> months have passed since we met and you agreed to work with us to clean up up your property. We <br /> wish to continue to work with you to document the success of your safflower remediation and to bring <br /> the site to closure. However, you must follow through with the actions you agreed to. <br /> The most cost effective way for you to clean the property is for you to make it a high priority to work <br /> with us. The 1972 Porter-Cologne Water Quality Act authorizes the Regional Board to assess penalties <br /> for noncompliance. If you have trouble meeting a due date, let us know in advance and we can work out <br /> something to our mutual benefit. <br /> The new schedule of tasks for you and/or your consultant to complete is as follows: <br /> By 15 February 2002: sign and return the cost recovery acknowledgement form and notify me who <br /> your consultant is. <br /> By 15 March 2002: provide a work plan and a time schedule to install a replacement well for MW-6, <br /> and sample the monitoring wells purusant to Monitoring &Reporting Program 97-812. <br /> By 15 May 2002: provide a monitoring report describing the results of the monitoring well sampling. <br /> We look forward to working with you again. If you have any questions, please do not hesitate to call me <br /> 4'9' <br /> ) 25TERRELL <br /> Private Sites Cleanup Unit <br /> cc: Mr. Michael Infurna, San Joaquin County Environmental Health Department, Stockton <br /> California Environmental Protection Agency <br /> Qd Recycled Paper _ <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. For a list of simple ways <br /> you can reduce demand and cut your energy costs,see our Web-site at http://w .swrcb.ca.gov/mgcb5 <br />