My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010 YEAR 4 PHYTOREMEDIATION TREE MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
ARCHIVED REPORTS_2010 YEAR 4 PHYTOREMEDIATION TREE MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:47:23 AM
Creation date
6/22/2020 8:32:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010 YEAR 4 PHYTOREMEDIATION TREE MONITORING REPORT
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> LSECTION 1 <br /> Introduction <br /> LThis tree monitoring report was prepared by CH2M HILL on behalf of SFPP, L.P.,an <br /> operating partnership of Kinder Morgan Energy Partners, L.P. (SFPP) for submittal to the <br /> LCentral Valley Regional Water Quality Control Board (RWQCB). This report documents the <br /> results of the fourth year (Year 4) of tree monitoring performed following installation of the <br /> phytoremediation system at the SFPP Holt Release Site (Site). <br /> LThe phytoremediation system was installed in two phases,January/February 2005 and <br /> April/May 2006,in accordance with the following cleanup plan that was conditionally <br /> approved by the RWQCB in an October 5,2004 letter to SFPP: Cleanup Plan Using <br /> L Phytoremediation for the Source Area at the SFPP, L.P. Holt Release Site,Holt, California <br /> (CH2M HILL,2004) (Phytoremediation Cleanup Plan). <br /> LAs-built conditions of the two phytoremediation system installation phases are documented <br /> in the following two reports that were submitted to the RWQCB: (1) Phytoremediation <br /> L As-Built Report for the Source Area at the SFPP, L.P. Holt Release Site,Holt, California <br /> (CH2M HILL,2005) and (2) Phytoremediation As-Built Report, Construction Season 2,for the <br /> Source Area at the SFPP, L.P. Holt Release Site,Holt, California (CH2M HILL,2007). <br /> L Tree Monitoring results for Years 1 through 3 were reported in the Year 1, Year 2,and Year 3 <br /> Phytoremediation Tree Monitoring Reports for the Source Area at the SFPP, L.P. Holt Release Site, <br /> Holt, California (CH2M HILL 2008a,2008b,2010). <br /> LThis tree monitoring report provides the following: <br /> • Section 2-Overview of the phytoremediation system <br /> L • Section 3-Tree system monitoring methodology <br /> • Section 4-Year 4 tree system monitoring results <br /> • Section 5-Summary and recommendations from the Year 4 monitoring results <br /> LThe location of the Site is shown in Figure 1-1. The Site and vicinity are shown in the aerial <br /> photograph in Figure 1-2.The tree phytoremediation planting layout that was originally <br /> L proposed is shown in Figure 1-3. The actual planting layout representing the as-built <br /> condition is depicted in Figure 1-4. Irrigation details are presented in Figure 1-5. <br /> L <br /> L <br /> L <br /> L <br /> LL SAG166749/103500001(YEAR4.2010_HOLTTREE_MONITORING_REPORT-FINAL.DOCX) iq <br />
The URL can be used to link to this page
Your browser does not support the video tag.