Laserfiche WebLink
JACOBS® Second Semiannual and 2018 Annual Groundwater Monitoring Report <br /> • <br /> Compounds detected in shallow groundwater during the second semiannual period for 2018 include the <br /> following: . <br /> • TPH-g was detected in shallow groundwater at wells N-7, N-8, N-15, N-16, N-17, and RW-1. <br /> Reported concentrations of TPH-g in these wells ranged from 0.93 milligrams per liter(mg/L) at well <br /> N-8 to 3.7 mg/L at well RW-1. <br /> • TPH-d was detected in shallow groundwater at wells N-7, N-16, N-17, M-10, and RW-1. Reported <br /> concentrations of TPH-d in these wells ranged from 0.54 K mg/L at well N-16 to 5.1 K mg/L for the <br /> duplicate sample at well N-7. The"K" flag indicates the diesel-range organics (DRO) concentration <br /> may include contributions from lighter-end hydrocarbons that elute in the DRO range. . <br /> • BTEX compounds were detected in shallow groundwater at wells N-7, N-8, N-15, N-17, 0-1, and <br /> RW-1. Reported concentrations of benzene in these wells ranged from 1.4 micrograms per liter(Ng/L) <br /> in wells N-8 and 0-1 to 840 pg/L at well N-7. <br /> Deeper Groundwater . <br /> No TPH-g, TPH-d, or BTEX compounds were detected in samples from deeper well N-24. This is <br /> consistent with data reported during previous sampling events. . <br /> 2.2 Status of Remediation and Other Completed Activities <br /> This section presents the status of remediation and other completed activities for the second semiannual <br /> period for 2018 (April through September 2018). <br /> 2.2.1 Remediation Activities <br /> The following remediation activities were performed: <br /> • Phytoremediation. Maintained the phytoremediation system as described in the Cleanup Plan Using • <br /> Phytoremediation for the Source Area (CH2M, 2004). <br /> • MNA. Continued semiannual groundwater monitoring and reporting in accordance with MRP <br /> No. R5-2018-0806. Groundwater concentrations for TPH-g, TPH-d, and BTEX constituents continue <br /> to be stable to decreasing on a sitewide and seasonal basis. <br /> 2.3 Planned Upcoming Semiannual Activities <br /> The following activities are planned for the first semiannual period for 2019 (October 2018 through • <br /> March 2019): <br /> • Continue semiannual groundwater monitoring and reporting in accordance with <br /> MRP No. R5-2018-0806. • <br /> • Continue maintenance of the phytoremediation system as described in the Cleanup Plan Using <br /> Phytoremediation for the Source Area (CH2M, 2004). <br /> • Perform the annual tree monitoring event and submit the annual tree monitoring report as described • <br /> in the Cleanup Plan Using Phytoremediation for the Source Area (CH2M, 2004). <br /> 4 AX1015181035SCO • <br /> • <br />