Laserfiche WebLink
Second Semiannual and 2018 Annual Groundwater Monitoring Report JACOBS® <br /> 4. References <br /> CH2M HILL (CH2M). 2002. Final Site Characterization Report for the SFPP, L.P. Holt Release Site, <br /> • Holt, California. January 31. <br /> CH2M HILL (CH2M). 2003. Bioremediation Pilot Study in Lieu of Continued Groundwater Pump and Treat <br /> for the SFPP, L.P. Holt Release Site, Holt, California. July 3. <br /> CH2M HILL (CH2M). 2004. Cleanup Plan Using Phytoremediation for the Source Area. September 10. <br /> • CH2M HILL (CH2M). 2005. Phytoremediation As-Built Report for the Source Area at the SFPP, <br /> L.P. Holt Release Site, Holt, California. May 31. <br /> • CH2M HILL (CH2M). 2007a. 3-Year Evaluation of the Bioremediation Pilot Study for the SFPP, <br /> L.P. Holt Release Site, Holt, California. June 13. <br /> • CH2M HILL (CH2M). 2007b. Phytoremediation As-Built Report, Construction Season 2, for the Source <br /> Area at the SFPP, L.P. Holt Release Site, Holt, California. January. <br /> CH2M HILL (CH2M). 2018. First Semiannual 2018 Groundwater Monitoring Report for the SFPP, <br /> • L.P. Holt Release Site, Holt, California. April 30. <br /> AX 1015181035SCO 4-1 <br />