Laserfiche WebLink
2.RESULTS FOR SECOND SEMIANNUAL PERIOD 2014 <br /> were not detected in wells M-1 and M-8 in previously collected samples (petroleum <br /> hydrocarbons were not present above the laboratory reporting limits in these wells). <br /> Compounds detected in shallow groundwater during the second semiannual period 2014 <br /> include the following: <br /> • TPHg was detected in shallow groundwater at wells N-7, N-17, and RW-1. Reported <br /> concentrations of TPHg in these wells ranged from 3.7 milligrams per liter (mg/L) at <br /> wells N-7 and N-17 to 8.7 mg/L at well RW-1. <br /> • TPHd was detected in shallow groundwater at wells N-7,N-17, and RW-1. Reported <br /> concentrations of TPHd in these wells ranged from 0.70 Z mg/L at well RW-1 to <br /> 8.6 Z mg/L for the duplicate sample at well N-7. <br /> • BTEX compounds were detected in shallow groundwater at wells N-7, N-15,N-16,N-17, <br /> 0-1,and RW-1. Reported concentrations of benzene in these wells ranged from <br /> 8.5 micrograms per liter (µg/L) at well N-17 to 2,400µg/L at well RW-1. <br /> Deeper Groundwater <br /> No TPHg,TPHd,or BTEX compounds were detected in samples from deeper well N-24. <br /> This is consistent with data reported during previous sampling events. <br /> 2.2 Status of Remediation and Other Completed Activities <br /> This section presents the status of remediation and other completed activities for the second <br /> semiannual period 2014(April through September 2014). <br /> ' 2.2.1 Remediation Activities <br /> The following remediation activities were performed. <br /> ' • Phytoremediation. Maintained the phytoremediation system as described in the Cleanup <br /> Plan Using Phytoremediation for the Source Area (CH2M HILL,2004). <br /> • Monitored Natural Attenuation. Continued semiannual groundwater monitoring and <br /> reporting in accordance with MRP No. R5-2007-0831. Groundwater concentrations for <br /> TPHg,TPHd, and BTEX constituents continue to be stable to decreasing on a sitewide <br /> and seasonal basis. <br /> 2.2.2 Other Completed Semiannual Activities <br /> ' The following additional activities were completed. <br /> Wildlife Habitat Council Certification <br /> SFPP continued implementing the Wildlife Habitat Management Plan submitted with the <br /> initial certification application to the Wildlife Habitat Council (WHC) (August 31,2007) <br /> as updated with the third recertification application(June 28,2013). The recertification <br /> period is for 3 years. The primary activities performed during the semiannual period <br /> included maintaining the habitat improvements installed as part of the Wildlife Habitat <br /> ' Management Plan. <br /> ' ES101214202053SCO 2-5 <br />