My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 9:25:45 AM
Creation date
6/22/2020 8:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GE<- <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION..................................................................................................... 1 <br /> 2.0 GEOLOGY AND HYDROGEOLOGY.................................................................. 1 <br /> 2.1 Geology................................................................................................................ 1 <br /> 2.2 Hydrogeology...................................................................................................... 1 <br /> 3.0 Scope of Work...........................................................................................................2 <br /> 3.1 Task 1 —Pre-Field Activities............................................................................... 3 <br /> 3.2 Task 2—Collecting Reconnaissance Soil Samples.............................................. 3 <br /> 3.3 Task 3—Disposal of Investigation Derived Waste..............................................4 <br /> 3.4 Task 4—Report Preparation................................................................................4 <br /> 4.0 SCHEDULE...............................................................................................................5 <br /> • <br /> FIGURES <br /> 1 Site Location Map <br /> 2 Site Vicinity Map <br /> 3 Area of Background Soil Samples <br /> APPENDICES <br /> A Sampling and Analysis Plan <br /> B Quality Assurance Project Plan <br /> C Health and Safety Plan <br /> • <br /> William DePaoli Property I <br /> Work Plan to Establish Background Soil Concentrations <br /> February 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.