Laserfiche WebLink
TABLE OF CONTENTS <br /> 1.0 INTRODUCTION 1 <br /> 2.0 BACKGROUND 2 <br /> 2.1 SITE SETTING/HISTORY 2 <br /> 2.2 SITE GEOLOGYAND HYDROGEOLOGY 2 <br /> 3.0 PREVIOUS SITE ASSESSMENTIINVES77GATION ACTIVITIES 4 <br /> 3.1 PHASE I ENVIRONMENTAL REVIEW 4 <br /> 3.2 PHASE I ENVIRONMENTAL SITE ASSESSMENT 4 <br /> 3.3 PHASE II ENVIRONMENTAL SITE ASSESSMENT 4 <br /> 3.4 FACILITY INVESTIGATION 5 <br /> 4.0 PROPOSED FIELD INVESTIGATION ACTIVITIES/PROCEDURES 7 <br /> 4.1 PRE-FIELDWORK ACTIVITIES 7 <br /> 4.2 SOIL CHARACTERIZATION 7 <br /> 4.3 GROUNDWATER MONITORING WELL INSTALLATION <br /> PROCEDURES 8 <br /> 4.4 MONITORING WELL DEVELOPMENT PROCEDURES 9 <br /> 4.5 GROUNDWATER SAMPLING PROCEDURES 10 <br /> 4.6 AQUIFER SLUG TESTS 11 <br /> 4.7 GROUNDWATER TIDAL INVESTIGATION 11 <br /> 4.8 QUALITY ASSURANCF/QUALITYCONTROL PROCEDURES 12 <br /> 4.9 EQUIPMENT DECONTAMINATION PROCEDURES 12 <br /> 4.10 INVESTIGATIVE-DERTVED WASTES 12 <br /> i <br />