My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007692
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0507153
>
ARCHIVED REPORTS_XR0007692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:41:12 PM
Creation date
6/23/2020 10:21:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007692
RECORD_ID
PR0507153
PE
2950
FACILITY_ID
FA0007717
FACILITY_NAME
THRIFTY OIL #171
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoHydrologic Consultants, Inc <br /> • 03/24/05 (multi-phase extraction test, EW-5S) <br /> • average TPHg concentration of 2,301 ppm, <br /> ' • average MTBE concentration of 1 11 ppm, <br /> • average benzene concentration of 16 4 ppm, <br />' • average flow rate of 102 cfm, approximately 29 13 pounds of hydrocarbon <br /> removed—extraction rate 87 4 pounds of hydrocarbon per day <br /> A total of 29 13 pounds of TPHg, 0 1652 pounds of benzene, and 0 0139 pounds of <br /> MTBE were removed and destroyed during the multi-phase extraction pilot test <br /> performed on EW-5S (Table 8) These correspond to removal rates of 87 4 pounds per <br /> day of TPHg, 0 496 pounds per day of benzene, and 0 0379 pounds per day of MTBE <br /> The cumulative totals for the combined multi-phase extraction tests performed on EW- <br /> 5D and EW-5S were 29 47 pounds of TPHg, 0 1791 pounds of benzene, and 0 0151 <br /> pounds of MTBE (Table 8) <br /> 6.0 AQUIFER TESTING <br /> 6.1 Description <br />' Two, 12-hour constant rate aquifer tests were perfonned on wells EW-5D (12-hours) and <br /> EW-5S (12-hours) on March 31 and April 6, 2005, respectively Monitoring wells EW- <br /> 5S, MW-4, TB-10, and TB-7 were used as observation wells during the pumping test on <br /> EW-51), and wells EW-513, MW-4, TB-10, and TB-7 were used during the pumping test <br /> on EW-5S Prior to conducting the pumping tests, the static water level was measured in <br />' the pumping well and observation wells using a 200 foot Solinst stainless-steel water <br /> level meter Depth to water was measured in extraction wells EW-5D and EW-5S and the <br /> surrounding monitoring wells to the nearest 0 01 foot interval both at the beginning and <br />' throughout the tests <br /> The pumping tests were conducted using a two-inch stainless-steel variable speed <br />' submersible Grunfos pump which was decontaminated by washing with non-phosphate <br /> detergent and triple rinsed with distilled water One new 50-foot garden hose and one <br /> decontaminated 50-foot garden hose was connected to the pump and the pump was <br />' lowered in the well to a depth of approximately 83 feet in well EW-5D (total depth of <br /> well 85 feet below top of casing), and to a depth of 58 feet (total depth of well 60 feet <br /> below top of casing) and tied off at that depth at the surface with a rope The purge water <br />' discharged from the hose was placed in a 4,000-gallon polyethylene Baker Tank All <br /> water generated during the test was vacuum trucked from the tank and properly <br /> . recycled/disposed <br /> r <br /> TOC 171 Pilot study Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.