My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007710
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0507153
>
ARCHIVED REPORTS_XR0007710
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:42:40 PM
Creation date
6/23/2020 10:37:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007710
RECORD_ID
PR0507153
PE
2950
FACILITY_ID
FA0007717
FACILITY_NAME
THRIFTY OIL #171
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A copy of the vapor well-head laboratory analytical results, and copies of vapor inlet/outlet <br /> • laboratory analytical results are presented in Appendix D A historical summary of hydrocarbons <br /> removed by vapor extraction is presented in Table 3, and individual well vapor concentrations are <br /> included in Table 4 Field Status System Reports are presented in Appendix C <br /> Site Activities <br /> On February 25, 2003, Thnfty forwarded an Additional Site Assessment Workplan as requested by <br /> the San Joaquin County Environmental Health Department (SJCEHD) letter dated August 13, 2003 <br /> Once Thrifty receives an approval from the SJCEHD for the workplan, three bids will be submitted <br /> to consultants to implement the workplan Once Thrifty receives the three-bid response, a contractor <br /> will be selected to perform the scope of work <br /> Thnfty will continue the current groundwater monitoring and sampling program, and continue <br /> operation of the vapor extraction system All interpretations expressed in this report are based solely <br /> upon the review of data collected by EMC and analysis by Associated Laboratories <br /> Written by Reviewed by <br /> oy13o�S-� � <br /> 7 <br /> a and C Fnednchsen, REAII Larry Hi inbotham <br /> Pr ect Manager, MBA Registered Geologist#5497' <br /> Senior Environmental Hydrogeologist <br />
The URL can be used to link to this page
Your browser does not support the video tag.