My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007712
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0507153
>
ARCHIVED REPORTS_XR0007712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:41:59 PM
Creation date
6/23/2020 10:39:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007712
RECORD_ID
PR0507153
PE
2950
FACILITY_ID
FA0007717
FACILITY_NAME
THRIFTY OIL #171
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f 7 <br /> removed by vapor extraction is presented in Table 3 Field Status System Reports are presented in <br /> i Appendix C <br /> A groundwater aquifer characterization test (24-hour pump test) was conducted by Hydrogeo <br /> Consultants on March 16 and 17, 2002, and the Aquifer Testing Report and Remedial Action Plan <br /> Report was forwarded to the San Joaquin County Site Mitigation Unit (SJCSMU) under Thrifty <br /> letterhead on July 15, 2002 <br /> I <br /> In a letter from the San Joaquin County, Environmental Health Department(SJEHD) on August 13, <br /> 2002, the SJEHD requested several items including a cost estimate for the groundwater extraction <br /> system proposed Via a telephone conversation with Mr Mike Infurna Jr , a representative of <br /> SJEHD, and Mr Raymond Friedrichsen, a representative of Thrifty Oil Co , it was agreed to wait <br /> until the results of the third quarter 2002 sampling event were known before any work plans were <br /> submitted Upon review of the data, Thrifty will be submitting a work plan for additional work as <br /> requested in the August 13, 2002 letter Thrifty is also including the cost estimates for the <br /> groundwater extraction system that was proposed in the Hydrogeo Consultants Aquifer Testing <br /> Report and Remedial Action Plan Report The cost estimate is presented in Appendix E, and will <br /> be Table 8 in the Hydrogeo report <br /> Thrifty will continue the current groundwater monitoring and sampling program, and continue <br /> operation of the vapor extraction system All interpretations expressed in this report are based solely <br /> upon the review of data collected by EMC and analysis by Associated Laboratories <br /> Written by Reviewed by p(,D <br /> w jM0IL <br /> Cr <br /> a <br /> and C Friedrxchsen, REAII im Zenor RG OF C <br /> 4roject Manager, MBA Registered Geologist#6701 <br /> Senior Environmental Hydrogeologist <br />
The URL can be used to link to this page
Your browser does not support the video tag.