Laserfiche WebLink
11 n <br /> . Conclusion <br /> Thrifty has completed the process of installing a Baker Furnace Thermal Oxidizer Unit The system <br /> began operations on July 1, 1999 Mr Mike Infurna, a representative of the San Joaquin County <br /> Health Department, was on-site to witness the system start-up, along with Mr Jeff Suryakusuma, <br /> Director of Earth Management Comapny Mr Suryakusuma answered Mr Infurna questions, and <br /> ensured the system was operational This is the first required quarterly report for the Baker Furnace <br /> Thermal Oxidizer vapor extraction system's operation <br /> A map of the vapor extraction unit underground piping, and the selected monitoring wells which <br /> they are connected is shown in Appendix E <br /> Thrifty will continue the current groundwater monitoring and sampling program Any monitoring <br /> wells which are connected system will have to be resurveyed due to well modification <br /> All interpretations expressed in this report are based upon review of data collected by EMC <br /> Written by _ Reviewed by <br />• Ray and C Friedrichsen u sell P ers, G 4549 <br /> Project Manager Pro ect anager iflsem ' <br /> Senior Hydrogeologist Geo og t kfOF CA+-� <br /> i <br /> i <br /> i <br />