Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Scope of work - Subsurface Site Assessment <br /> Page - 2 - <br /> feet will be backfilled with a bentonite cement mixture. <br /> Prior to drilling, underground utilities, gasoline/diesel tanks <br /> and piping will be verified in the field. <br /> Drilling permits for boring installations will be obtained where <br /> required by local agencies. <br /> SOIL SAMPLES <br /> Soil samples shall be taken every 5 feet and evaluated in the <br /> field with an organic vapor meter (OVH) and a head space analysis <br /> technique for the purpose of identifying the visible presence or <br /> odor of hydrocarbons. <br /> In the event a material presence or odor of hydrocarbons is <br /> detected in the samples, the soil samples taken every ten feet <br /> shall be analyzed in a laboratory for the presence of <br /> hydrocarbons. Results shall be reported as total petroleum <br /> hydrocarbons (TPH) using E P. A. method 8015. <br /> WATER SAMPLES <br /> 0 If the groundwater table is encountered, it shall be <br /> characterized as to the presence or absence of free floating <br /> hydrocarbons. If free floating hydrocarbons are not encountered <br />