Laserfiche WebLink
i <br /> UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM(Page f of i) <br /> Type of Action ❑Installation Inspection ❑Repair Inspection 36 Month Inspection <br /> 1. FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10181399 5/2/19 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Business Site Address city ZIP Code <br /> 2375 West Grant Line Road Tracy 95377 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection(Print as shown on the ICC Certification.) Phone# <br /> John E Powers Jr. 1 760-722-9002 <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 888681 8190954 4/26/2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications(List applicable centifications.) <br /> Veeder root TLS-350, OPW Stage I, Emco Wheaton Stage I, Phil Tite Stage I <br /> III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ®Manufacturer Guidelines(Specify): <br /> Used: Removed drop tubes and check for correct placement <br /> ❑Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> Attach the Inspection procedures and all documentation required to determine the results. #of Attached Pages <br /> TANK ID:(By tank number,stored product,etc.) #187-1 #2 89 #3 91 #4 Diesel <br /> What is the tank Inside diameter?(Inches) 96.00" 96.00" 96.00" 96.00" <br /> Is the fill piping secondarily contained? ®Yes ❑No H Yes ❑No ®Yes ❑No IS!Yes ❑No <br /> Is the vent piping secondarily contained? Yes ❑No ®Yes ❑No 9 Yes ❑No <br /> IN Yes ❑No <br /> Overfill Prevention Equipment Manufacturers) OPW 61SO OPW61SO OPW 61S0 <br /> What Is the overfill prevention equipment response IR Shuts Off Flow 19 Shuts Off Flow ®Shuts Off Flow $I Shuts Off Flow <br /> when activated? <br /> (Check all that apply.) ®Restricts Flow ®Restricts Flow Restricts Flow $i Restricts Flow <br /> ❑A/V Alar ❑AIV Alar ❑AIV Alarm ❑AIV Alarm <br /> Are flow restrictors installed on vent piping? ❑Yes ®No ❑Yes ®No ❑Yes ®No ❑Yes 19 No <br /> At what level in the tank is the overfill prevention set <br /> to activate?(Inches from bottom of tank.) 91.2" 91.2" 91.2" 91.2" <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 95% 95% 95% 95% <br /> Is the overfill prevention in proper operating condition ®Yes ®Yes ®Yes H Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑No(Specify In V.) ❑No(Specify in V.) ❑No(Specify in V.) ❑No(Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ®Pass ❑Fail I ®Pass Cl Fail 1 ®Pass ❑Fall ❑Pass ❑Fall <br /> V. COMMENTS <br /> Any items marked"Fail'must be explained in this section. Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was Inspected in accordance with California Code of Regulations,Title 23, <br /> Division 3,Chapter 16,Section 2637.2 and all the Information contained herein Is accurate. <br /> UST Service Technician Signature <br /> N the facility has more components than thf torn accommodates,additional copies of this page may be attached. <br /> CERS=Calbria EnvironrnertEl Repo"System,ID=iden56cation,UST=Underground Storage Tank,ICC=lrrnafional Code Council,A/V=Audble and Visual <br />