Laserfiche WebLink
i <br /> a- <br /> w <br /> VIA <br /> 001 D" <br /> r <br /> ;QUARTERLY MONITORING REPORT <br /> THIRD QUARTER 1991 <br /> COCA—COLA ENTERPRISES DISTRIBUTION FACILITY <br /> STOCKTON,CALIFORNIA <br /> %USTEC JOB NO, 90054.03 <br /> I <br /> 1.0 INTRODUCTION <br /> s <br /> U.S. Technical Environmental Consulting, Inc. (USTEC) has completed the third quarter 1991 <br /> quarterly groundwater monitoring at the Coca-Cola Enterprises - West distribution facility <br /> located at 1100 North Wilson Way,Stockton,0"fornia(Figure 1). This monitoring program was <br /> authorized by Mr. Steve McConnell, Division Manager, Occupational/Environmental Safety, <br /> Coca-Cola Enterprises - West (CCE-W). <br /> �., This is the fourth report in the quarterly groundwater monitoring program, initiated in <br /> + December:990. The monitoring program was recommended after groundwater contamination <br /> � s <br /> was found to be present during site assessment activities. The assessment activities are <br /> summarized in USTEC's November 1990 report titled"Contamination Assessment Report,Coca- <br /> "` Cola Enterprises -West, Stockton,California". The purpose of the program is to monitor the <br /> petroleum hydrocarbon fuel constituents in the groundwater,and to assess the possible migration <br /> path of these constituents throughout the site. This report documents USTEC's observations, <br /> field procedures,analytical methods,results,conclusions,and re ommendations for groundwater <br /> r <br /> monitoring completed in the third quarter 1991. <br /> i <br /> 2.0 GROUNDWATER ELEVATION MEASUREMENT PROCEDURES AND RESULTS <br /> ` i <br /> - This section describes the groundwater elevation measurements and resulting data. <br /> j � I <br /> �. <br />