My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012663
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1100
>
2900 - Site Mitigation Program
>
PR0507217
>
ARCHIVED REPORTS_XR0012663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 4:53:26 PM
Creation date
6/23/2020 2:20:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012663
RECORD_ID
PR0507217
PE
2950
FACILITY_ID
FA0007741
FACILITY_NAME
AUTO ZONE INC
STREET_NUMBER
1100
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
11733035
CURRENT_STATUS
02
SITE_LOCATION
1100 N WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coca-Cola Enterprises-West <br /> U5TEC Job No. 90054.03 <br /> e of the project responsibility proposed for each of the project <br /> brief discussion of the scop <br /> F management personnel is presented below: <br /> i <br /> Pro ect PrincipaHn-Charge <br /> E o <br /> project <br /> Steve Myers <br /> R.G., President, will serve as the project <br /> , <br /> I pcharge• Mr. Myers retains the ultimate responsibility <br /> rincipal-in- <br /> i for the perFormance of the project personnel and the Final results <br /> of the project, Mr.Myers is a Registered Professional Geologist in <br /> l the State of California. <br /> { <br /> -i <br /> i o Project Director <br /> Mr. Nyle Layton, P.G•, Vice President, will serve as the project <br /> j <br /> director, The function of the project director will be to provide <br /> critical review of all technical aspects of the project. <br /> l <br /> t <br /> o Senior Project Manager <br /> Mr.Rowland L.Hall,R.G., will serve as the Senior Project Manager. Mr. <br /> E <br /> Hall will manage all phases of the project, will be directly responsible to <br /> the Client, and will oversee alll project coordination and scheduling,and <br /> will prepare or review all rep <br /> i O Site Safety Officer/Project Manager <br /> ponsible for <br /> Mr. Michael Roche,R.G., will serve as the Site Safety Officer and <br /> ! r Project Manager for he pand scheduling, site Slsafetyl be s and project <br /> all project coordination <br /> tracking• <br /> i o Remediation Engineer <br /> W <br /> Mr.Luis Rivas,P-E.,will serve as the Remediation Engineer for the <br /> i protect. Mr.Rivas wilt be responsible for the technical and design <br /> e remediation system. <br /> aspects for th <br /> i the <br /> o Remediation System Installation <br /> Manager Mr.icoordinate Austin <br /> will serve as <br /> will Austin and be responsible for lall�ons ruction <br /> s y activities at the site. <br /> o Discipline i eaders a beask Managers <br /> responsible to the Project Manager and <br /> These individuals w <br /> will monitor the specializedarelwlell qualified ine or task tinteach particular <br /> assigned. These professionals <br /> specialty and possess the necessary expertise so that all technical <br /> requirements are achieved. <br /> 29 <br /> _ f <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.