My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007878
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1100
>
2900 - Site Mitigation Program
>
PR0507217
>
ARCHIVED REPORTS_XR0007878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:49:26 PM
Creation date
6/23/2020 3:01:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007878
RECORD_ID
PR0507217
PE
2950
FACILITY_ID
FA0007741
FACILITY_NAME
AUTO ZONE INC
STREET_NUMBER
1100
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
11733035
CURRENT_STATUS
02
SITE_LOCATION
1100 N WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Working 7o Restore Nature <br /> 1 Addendum One to Remedial Action Pian March 1, 1993 <br /> Coca-Cola Former Distribution Facility, Stockton, California 54006.01 <br /> ' permit application forms. <br /> ' The complete set of Plans and Specifications will also be submitted to the City Building, <br /> Planning and Fire Departments for review, comment and approval prior to construction and <br /> installation of the VES. <br /> Task 6. Pre-Construction Phase <br /> This task includes necessary engineering and Contractor work prior to beginning <br /> construction Contractor work includes, but is not limited to, ordering specified equipment <br /> and materials; scheduling field equipment and manpower; posting Bonds and paying <br /> ' necessary City Fees; attending the Pre-Construction Conference with the engineer and <br /> Pack Gas and Electric (PG&E), underground utility location; and equipment and <br /> manpower mobilization. The pre-construction phase of a project is generally about 4 to 6 <br />' weeks depending on the lead time needed between ordering and receiving equipment. <br /> Engineering pre-construction activities include a Pre-Construction Conference with the <br /> Contractor and PG&E, the City Inspector if applicable, and others as needed; a site visit <br /> with the Contractor, marking off the well numbers at the site, completing or assisting the <br />' Contractor with completing necessary PG&E service forms for electric service at the <br /> remediation compound; a site visit with PG&E; finalizing any outstanding Permits to <br /> Construct; informing the appropriate regulatory agencies of construction startup, and <br />' scheduling and coordination with the Contractor. <br /> Task 7. Construction <br />' After the SJVUAPCD Permit to Construct has been approved as well as the City Building <br /> Permit, and other necessary permits;and after the construction Contractor has had sufficient <br /> time to order and receive the equipment and materials (about 4 to 6 weeks), construction <br /> will begin. <br />' The scope of work for construction is specified in detail in the construction Plans and <br /> Specifications,which together with any Addenda and Change Orders comprise the full scope <br /> of work. The construction phase of the project includes all construction Contractor, <br />' subcontractor, and PG&E direct costs for construction of the remediation system, including <br /> equipment, labor, and materials. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.