My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WELL ABANDONMENT, SOIL AND GROUNDWATER INVESTIGATION REPORT 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35275
>
2900 - Site Mitigation Program
>
PR0508042
>
ARCHIVED REPORTS_WELL ABANDONMENT, SOIL AND GROUNDWATER INVESTIGATION REPORT 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 1:38:30 AM
Creation date
6/23/2020 3:31:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WELL ABANDONMENT, SOIL AND GROUNDWATER INVESTIGATION REPORT 2009
RECORD_ID
PR0508042
PE
2960
FACILITY_ID
FA0005316
FACILITY_NAME
U S CAN COMPANY
STREET_NUMBER
35275
Direction
S
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25518009
CURRENT_STATUS
01
SITE_LOCATION
35275 S WELTY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pit U4'2UU'J 14:20 BUJ-J4U- 1252 AL I HANS U10 HEH.M1 I':� NA(:)E 04/04 <br /> ' t 009-61 K-0051 <br /> 3anuvy 26,2009 <br /> Page 3 of 3 <br /> the State Water Resources Control Board on July 15, 1999. The Permittee shall <br /> also conform to the requirements of the General NPDES Permit for construction <br /> Activities and any subsequent General Permit in effect at the time of issuance of this <br /> Encroachment Permit. These permits regulate storm water discharges associated with <br /> 1 year-round construction or special event encroachment activities. <br /> For all projects of 1 acre (0.405 ha) or more the Permittee shall develop, implement, <br /> 1 and maintain a Storm Water Pollution Plan (SWPP) and for projects less than 1 acre <br /> (0.405 ha) a Water Pollution Control Program (WPCP). Either the Plan or Program <br /> shall also conform to the requirements of the Caltrans Storm Water Quality Handbook, <br /> 1 Construction Contractor's Guide and Specifications and Caltrans Specification Section <br /> 7-1-.01 G and subsequent revisions. <br /> 1 No lane closures, shoulder closures or other traffic restrictions shall be allowed on the <br /> following day(s): January 1 — New Years Day, Martin Luther King Jr. Day, Lincoln's <br /> Birthday, Washington's Birthday, Cesar Chavez Day, Memorial Day, July 4 — <br /> 1 Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, <br /> Friday Day after Thanksgiving, December 25 - Christmas Day. When a holiday falls on <br /> a Sunday, it is observed on the following Monday. <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.