My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SECOND 2008 SEMI-ANNUAL GROUNDWATER MONITORING AND SAMPLING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35500
>
2900 - Site Mitigation Program
>
PR0508043
>
ARCHIVED REPORTS_SECOND 2008 SEMI-ANNUAL GROUNDWATER MONITORING AND SAMPLING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 1:39:02 AM
Creation date
6/23/2020 3:38:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SECOND 2008 SEMI-ANNUAL GROUNDWATER MONITORING AND SAMPLING REPORT
RECORD_ID
PR0508043
PE
2960
FACILITY_ID
FA0007905
FACILITY_NAME
CHEVRON PIPELINES
STREET_NUMBER
35500
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25526003
CURRENT_STATUS
01
SITE_LOCATION
35500 WELTY RD
P_LOCATION
99
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' M. Scott Mansholt—CEMC <br /> Second Semi-Annual 2008 Groundwater Monitoring and Sampling Report September 26,2008 <br /> Vernalis Pump Station Page 7 of 7 <br /> 1 may be completed. These regulatory approval letters and the groundwater analytical <br /> results map6 which encompasses both sites are included in Attachment C. <br /> • After submitting the HHSE, SAIC will prepare separate no further action required request reports <br /> for the site and Vernalis Offsite(Bogetti). <br /> CLOSING <br /> If you have any questions regarding this report, please call Caryl Sheehan at (916) 979-3836. <br /> Sincerely, <br /> SCIENCE APPLICATIONS INTERNATIONAL CORPORATION <br /> Andrew B. Smith Caryl San, P.G. 6620 G <br /> Project Scientist Senior iject Manager c, �� .n <br /> C�-SONA <br /> Enclosures: a SHEEN <br /> Na <br /> Figure 1. Vicinity Map <br /> Figure 2. Site Map i,� E►N�'�` r' <br /> Figure 3. Potentiometric Surface Map—July 2008 <br /> Figure 4. Potentiometric Surface Map—April 2008 q OF CAS <br /> Figure 5. Petroleum Distribution in Groundwater—July 2008 <br /> Figure 6. Petroleum Distribution in Groundwater—April 2008 <br /> Table 1. Groundwater Elevation Data and SPO Thickness Measurements <br /> Table 2. Groundwater Analytical Results(TPH,BTEX,and MTBE) <br /> Table 3. Groundwater Analytical Results (PAHs) <br /> Table 4. Monitoring Well Construction Details <br /> ' Attachment A. Field Data Sheets <br /> Attachment B. Data Usability Summary and Laboratory Analytical Reports (July 2008 and May 2008 <br /> Data) <br /> Attachment C. RWQCB Soil and Groundwater Investigation Report Review Letters dated 9/20/06 and <br /> 7/28/08; and Figure 3: Groundwater Analytical Results Map from Soil and Groundwater <br /> Investigation Report, Vernalis Offsite, 6/25/08 <br /> i <br /> 6. SAIC,2008. Soil and Groundwater Investigation Report, Vernalis Offsite, Vernalis, California. June 25. <br />
The URL can be used to link to this page
Your browser does not support the video tag.