My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SOIL AND GROUNDWATER INVESTIGATION REPORT 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35500
>
2900 - Site Mitigation Program
>
PR0508043
>
ARCHIVED REPORTS_SOIL AND GROUNDWATER INVESTIGATION REPORT 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:37:22 AM
Creation date
6/23/2020 3:39:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SOIL AND GROUNDWATER INVESTIGATION REPORT 2008
RECORD_ID
PR0508043
PE
2960
FACILITY_ID
FA0007905
FACILITY_NAME
CHEVRON PIPELINES
STREET_NUMBER
35500
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25526003
CURRENT_STATUS
01
SITE_LOCATION
35500 WELTY RD
P_LOCATION
99
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/18/2007 15:u6 209-948-7232 i;ALTRANS D10 PERMI-iS PAGE 03/04 <br /> 07 0904613P.doe <br /> Deccm6cr 1 8 2007 <br /> Page 2 of <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN, PERMITTEE SiiALL FILL <br /> OLIT AND MAIL NOTICE OF COMPLETION PROVIDED BY GRAN i-OR. <br /> 1 Permiftee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State <br /> Standard Specifications Reference to Engineer in the State Standard Specifications <br /> shall include State Representative. <br /> Permittee is directed to Standard Specification section 7-1,11 Preservation of Property, <br /> and Business and Professions Code, Section 8771. Permittee shall physically inspect <br /> the work site and locate survey monuments prior to work commencement. Monuments <br /> shall be referenced or reset in accordance with Business and Professions Code. <br /> Permittee shall fully conform to the requirements of the Caltrans statewide NPDES <br /> Storm Water Permit, Order No. 99-06-DWO, NPDES No. CAS000003, adopted by <br /> the State Water Resources Control Board on July 15, 1999. The Permittee shall <br /> also conform to the requirements of the General NPDES Permit for construction <br /> Activities and any subsequent General Permit in effect at the time, of issuance of this <br /> Encroachment Permit. These permits regulate storm water discharges associated with <br /> year-round construction or special event encroachment activities. <br /> For ail projects of I acre (0.405 ha) or more the Permittee shall develop, implement, <br /> and maintain a Storm Water Pollution Prevention Plan (SWPPP) and for projects less <br /> than I acre (0,405 ha) a Water Pollution Control Program (WPCP). Either the Plan <br /> or Program shall also conform to the requirements of the Caltrans Storm Water Quality <br /> Handbook, Construction Contractor's Guide and Specifications and Caltrans <br /> Specification Section 7-1-.01G and subsequent revisions. <br /> Except when necessary, as determined by the State Representative, no installation, <br /> construction equipment or personal vehicles shall operate or park within the traveled <br /> way. <br /> Pavement cutting shall be done by a saw-cutting method and said method shall be <br /> approved by the State representative prior to the start of work. <br /> Traffic control shall be done in conformance with Manual on Uniform Traffic <br /> Control Devices 2006 California Supplement. <br /> Permitteelcontractor shall work with the State representative to request the <br /> necessary lane closure needed. Request shall be the week prior to the actual <br /> work, The State representative shall submit closure through the Lane Closure <br /> System (LCS) for Traffic Management Center (TMC) approval by Wednesday <br /> afternoon of the week prior. <br /> All Lane closures shall be called in by either the contractor to the TMC when the closure <br /> begins (10-97). ends (10-98). or is cancelled (10-22). The 1-MC can be reached (24-1) <br /> at (209) 948-7566 or 7551. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.