Laserfiche WebLink
i <br /> 6.0 PROJECT SCHEDULE <br /> I <br /> F <br /> Field activities will commence on approval of this work plan by the SJC-EHD and <br /> after drilling permits have been obtained For the scope of work described in this work plan, it is <br /> anticipated that field activities will require one to two weeks to complete Laboratory analyses <br /> will take approximately two weeks to complete on final receipt of the soil and groundwater <br /> k samples obtained in the field It Is anticipated that the final report will be sumitted to SJC-EHD <br /> about two weeks after receipt of the laboratory analytical results <br /> i <br /> i <br /> I <br /> Preliminary Site Investigation Work Plan-Draft June 34, 1998 <br /> Roberts Property(Former Vernalis Pump Station) <br /> Vernalis,Californl8 <br /> 17 <br />