My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
0
>
2900 - Site Mitigation Program
>
PR0515450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 6:26:41 PM
Creation date
6/23/2020 3:50:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515450
PE
2960
FACILITY_ID
FA0012153
FACILITY_NAME
SOUTH SHORE PARCEL
STREET_NUMBER
0
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
WEBER AVE
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR w secorcom <br /> INTERNATIONAL <br /> S E C O R INCORPORATED 3017 Kilgore Road,Suite 100 <br /> Rancho Cordova,CA 95670 <br /> 916-661-0400 TEL <br /> 916-861-0430 F" <br /> HUMPED <br /> SEP - 7 2005 <br /> August 31, 2005 <br /> ENVIRONMENT HEALTH <br /> PERMIT/SERVICES <br /> Ms. Mary Serra <br /> Regional Water Quality Control Board—Central Valley Region <br /> 11020 Sun Center Drive, #200 <br /> Rancho Cordova, CA 95670 <br /> Re: Meeting Minutes from the August 25, 2005 Parcel 2A Technical Meeting at the Regional <br /> Water Quality Control Board, Rancho Cordova, California Office <br /> L&M Operable Unit <br /> Stockton Parcel 2A <br /> West Weber Avenue and North Lincoln Street <br /> Stockton, California / <br /> Dear Ms. Serra: <br /> This letter and attachment, prepared by SECOR International Incorporated (SECOR)on behalf of the L&M <br /> Operable Unit Group (L&M OU), provides the meeting minutes from the August 25, 2005 meeting held at <br /> the Regional Water Quality Control Board's (RWQCBs) Rancho Cordova office. The meeting was called <br /> by Mary Serra to provide technical discussion of the Parcel 2A, West Weber Avenue and Lincoln Street, <br /> Stockton, California ("the Site"). The meeting minutes were recorded by SECOR International, Inc <br /> (SECOR). Attendees at the meeting included Mary Serra and Duncan Austin from the RWQCB, Dan <br /> • Schreiner and Rusty Benkosky from SECOR, Tom Bauhs from Chevron, Tracy Sizemore (by phone)from <br /> ConocoPhillips, Kitty Walker form the City of Stockton Redevelopment Agency (RDA), and Robert Traylor <br /> from Golden State Environmental (GSE). The following is a list of highlights from the meeting: <br /> • The meeting followed (generally) the meeting agenda submitted to the RWQCB via email by <br /> Robert Traylor on August 24, 2005. <br /> • Terms of the Settlement Agreement between the RDA and ConocoPhillips and Chevron <br /> (collectively"the L&M Group") were discussed. The RDA will provide a copy of the Settlement to <br /> Mary Serra. <br /> • High metals concentrations present in shallow soil in areas of the Site are most likely from fill <br /> material used in low lying areas of the Site. <br /> • The dual-phase system and part of the soil-vapor system at the L&M OU are currently operating. <br /> • The L&M Group plans to start excavation on the Unocal OU, per the RWQCB approved work <br /> plan, on August 29, 2005. <br /> • The RDA will not allow SECOR to conduct that work on behalf of the L&M Group at the <br /> Unocal OU. <br /> • The Human Health Risk Assessment is complete and currently with the Department of Toxic <br /> Substances Control for review and comment. <br /> • The L&M OU and Unocal OU will be cleaned to standards based on land use. <br /> • The RDA and the L&M Group are working together to address allocation of responsibility for <br /> groundwater cleanup on the Unocal and Alco OUs. <br /> • The RWQCB stated that the entire excavation scope of work outlined in the approved work plan <br /> submitted by SECOR must be carried out. <br /> • The RWQCB asked that the RDA and the L&M Group provide a plan to proceed at the Site on <br /> Tuesday,August 30,2005. <br />
The URL can be used to link to this page
Your browser does not support the video tag.