Delta Gateway Apartment Site and Adjacent Property
<br /> Fact Sheet-'' Start Work Notification of Soil Sampling, 2 8 2003
<br /> Groundwater Monitoring Well Installation, T HEALTH
<br /> March 2003 t` Groundwater Monitoring Well Development, -RVICES
<br /> and Groundwater Sampling .
<br /> oEFxR„ „.OF Fow<
<br /> LVGif(i 1164 TO CL
<br /> Stockton,
<br /> Under the oversight of the California Environmental Protection Agency,Regional
<br /> Water Quality Control Board(RWQCB), and Department of Toxic Substances
<br /> Control(DTSC), SECOR International and Clayton Group Services will be
<br /> conducting soil sampling, groundwater monitoring well installation,groundwater
<br /> monitoring well development, and groundwater sampling activities at the Delta
<br /> Gateway Apartment site(Site)located at 720 and 802 West Weber Avenue and at the
<br /> LD7fiC`is at:n of si.e adjacent property identified as Parcel 2A located at the southwest comer of West
<br /> Boards and Weber Avenue and Lincoln Street, Stockton,California. Parcel 2A is currently a
<br /> �Dq)drunentr within vacant lot.
<br /> tlrc Ctdijnntia
<br /> 1'nr trn zrit,r;tnl In November 2000, September 2001, and May 2001, soil,groundwater, and soil gas
<br /> r ir[et'tit rr Agettc;t'. sampling activities were performed at the Delta Gateway Apartment and Parcel 2A
<br /> 1 he.5i I Deportn east's sites. This current investigation is to confirm the information that was obtained
<br /> during the previous sampling activities,as well as to determine if groundwater below
<br /> i oteei rt to restore, the Site has been impacted. Construction of
<br /> rrt&=et urrd enhance p groundwater monitoring wells at the
<br /> Site will allow groundwater to be sampled on a quarterly basis.
<br /> dlte envlrrorttnetrl,
<br /> ensurehublic'health Sampling activities are expected to occur March 3 through April 15 between the
<br /> environmental hours of 7:00 a.m.to 6:00 p.m. Sampling of Site groundwater monitoring wells will
<br /> quality and occur once every three months between the hours of 7:00 a.m.to 6:00 p.m. A
<br /> irCanontic vitality, Wiling rig,supply truck, and forklift will be used to collect soil samples and install
<br /> by regidtrfh g groundwater monitoring wells at seven locations within the Delta Gateway
<br /> Apartment complex. Smaller trucks will be used to develop and sample the
<br /> tut;urtlnus ivu stir, groundwater monitoring wells. As a standard safety precaution,workers operating
<br /> conductinA,and the drilling rig,development truck,and groundwater sampling truck,as well as
<br /> V e'ersec h workers overseeing the sampling activities,may wear protective clothing and
<br /> cleunaps, and possible air purification equipment during actual drilling,development,and sampling
<br /> develnpitzu” activities.
<br /> w attdprontrting
<br /> Ilution pt erewion. Specific information regarding this project is available in the Response to RWQCB
<br /> Letter Dated September 9, 2002 And Work Plan For Additional Site Assessment,
<br /> Parcel 2A and Adjacent Areas, Stockton, California, dated December 19,2002.
<br /> This Work Plan is available for public review at the Cesar Chavez Central Library,
<br /> tate of California located at 605 North EI Dorado Street in Stockton, California,under the file name
<br /> "West Weber Avenue and North Lincoln Street-Delt-Gateww '.=ftnents".
<br /> o kt Additionally,the Work Plan is available for pv Jc revie i +.-_ Qi,B Cleanup
<br /> Annex, 10365 Old Placerville Road, S-it,2 "�� :a;i:n a. If you are
<br /> interested in reviewing the Plan,please visit the library or contact the RWQCB
<br /> Project Manager,Devra Lewis, at(916)255-3119.
<br /> Califoinia
<br /> E-n vitonmental : Once soil and groundwater samples have been analyzed,RWQCB and DTSC will
<br /> i-otection Agency determine what, if any,additional actions need to be taken to protect human health
<br /> or the environment.
<br /> ,4
<br /> Questions or concerns should be directed to any of the following project contacts:
<br /> - Devra Lewis,RWQCB Project Manager, at 916-255-3119
<br /> Q j g Jerry Lile,DTSC Project
<br /> w Manager, at 916-255-3744,or Heidi Nelson,Public Participation Specialist,at 916-
<br /> `: f 255-3575.
<br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy
<br /> consumption. For a list ofsimple ways yoA.can reduce demand and cut your energy costs,see our website at www.doc.ca.g-o
<br />
|