Laserfiche WebLink
i • <br /> Stantec <br /> 2010 TIDEWATER STOCKTON WORK PLAN <br /> • A bag filter followed by a flow totalizer installed on the discharge side of each of the <br /> transfer pumps of the respective air/water separator tanks; <br /> • Approximately 18,000 gallon plus storage tank with secondary containment; and <br /> • Miscellaneous fittings, meters, and equipment. <br /> In order to extract groundwater from the recovery wells, a stinger tube will be lowered into the <br /> well casing and groundwater will be recovered using the TPE configuration; and a separate <br /> vacuum blower will be employed on each GWE well. The TPE manifolds and headers will be <br /> outfitted with appropriate fittings for vapor sampling and vapor/water flow measurement. <br /> 3.3.2.2 TPE Continuous Operation <br /> The TPE equipment will operate continuously for at least 48 hours but not longer than 72 hours <br /> on the GWE wells in the TPE configuration. The following data will be recorded approximately <br /> every two hours (except at night)thereafter as appropriate for each GWE well: <br /> 1. Groundwater elevations in the test wells will be measured and recorded prior to <br /> initiation; <br /> 2. Hour meter readings; <br /> 3. Applied wellhead vacuum levels in GWE wells; <br /> 4. Stinger tube vacuum at the TPE wellheads; <br /> 5. Extracted airflow rates from the GWE wells (measured at wellhead); <br /> 6. Groundwater levels in observation wells; <br /> 7. Total groundwater flow rate; <br /> 8. Collect influent vapor samples and analyze soil vapor concentrations with flame <br /> ionization detector(FID) meter; <br /> 9. Groundwater elevations will be measured in the test wells after the equipment is <br /> shutdown at the end of the test. <br /> Groundwater samples will be sampled once at the end of the test from each extraction well (see <br /> Task 4). <br /> Once the TPE operations are completed, the TPE equipment will be decontaminated, <br /> dismantled, and secured as needed. All groundwater monitoring wells and test wells will be <br /> secured and the site returned to pre-test conditions. <br /> 3.12 <br />