My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4733
>
2300 - Underground Storage Tank Program
>
PR0232510
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:15 PM
Creation date
6/23/2020 4:29:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232510
PE
2361
FACILITY_ID
FA0003924
FACILITY_NAME
HUNT & SONS INC - ARCH ROAD CARDLOCK
STREET_NUMBER
4733
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95206
APN
17930008
CURRENT_STATUS
01
SITE_LOCATION
4733 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar , 9 , 2020 11 . 11AM Donlee Pump Co No - 3522 P . 3 I <br /> UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page4 of 6) <br /> Xlll. VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from section III for each Manufacturer <br /> AD 13 [J CD DO <br /> AD BD CD DLITest Method Used; <br /> D Manufacturer Gulde►inas: (Specify) <br /> D Industry Code or Eggineering Standard : (Specify) <br /> D Englnaered Method: (Specify) <br /> Aftaoh the testing procadures and all documentation required to determine the results. # of Attached Pages <br /> Vapor Recovery Piping Containment Tesfing Training and Certification$ (List appllcablo cer►ircations.) Expiration Date <br /> Interstitial Communication Verification Method Used: <br /> XIV. COMMENTS <br /> Provido any eddillonal r ommants here. <br /> XV, TURBINE I PRODUCT PIPING SUMP TESTING INFORMATION <br /> Manufacturer Idenli Tank ID from section III for each Manufacturer <br /> Ni <br /> AX I Bd I CD DD <br /> AD ED CD D ❑ <br /> Test Method Used; <br /> Menufarlurer Guidelines: (Specify) <br /> D Industry Code or Engineering Standard, (Spe0y) <br /> ❑ Engineered Method : (Specify) <br /> # of Attached Pages <br /> Attach the testing procedures and all dboumentation required to determine the results. <br /> Turbine l Product Piping Surpp Tosling Training and Certifications (List applicable cerflToallons.) Expiration Date <br /> XVL COMMENTS <br /> ProVida any actdltional comments here. <br /> E <br /> ll <br /> fF <br /> YTt = Trl�ntiFn+�dnr, ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.