Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Parte 5 of 6) <br />XII. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />This section must be completed IfLLDs are Installed. <br />Y <br />N <br />NA <br />Was a leak simulated to verify LLD performance? <br />(Check all that apply.) Simulated leak rate verified: ❑X 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br />❑ <br />❑ <br />Was the testing apparatus property calibrated? <br />❑X <br />❑ <br />❑ <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />❑ <br />❑ <br />X❑ <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />X❑ <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off wren a leak is detected? <br />❑ <br />❑ <br />❑X <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />I ❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />❑ <br />X❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />❑ <br />X❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑X <br />❑ <br />❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />❑X <br />L1 <br />I ❑ <br />For any answer of "M' above, describe in Section Xlll how and when these Issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM / PRESSURE I HYDROSTATIC MONITORING EQUIPMENT TESTING <br />X Check this box if VPH monitoring is NOT used. (Do not complete this section) <br />This section must be completed if VPH monitoring is used to perform leak defection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor ID <br />Component(S) Monitored By This Sensor Sensor Functionality Interstitial <br />Test <br />❑ Pass ❑ Fail <br />Commurrcation <br />❑ Pass <br />Test <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Pass <br />❑ Fail <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail I <br />❑ Pass ❑ Fail I <br />❑ Pass <br />❑ Pass <br />❑ Fail <br />❑ Fail <br />❑ Pass ❑ Fait I <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Pass <br />❑ Fall <br />❑ Fail <br />❑ <br />Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />E <br />Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space p ❑Visual Inspection <br />❑ Other (Describe the method in section XV below.) El Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No Describe the reason in section XV below.) <br />For any answer of "Fail" above, describe in Section XV how and when these issues were or will be corrected. <br />XV. COMMENTS <br />GPH = Gallons Per Hour, Y =Yes, N =No, NA =Not Applicable, VPH = VacuurtrRess ie,"ydrostatic, ID = ldatifralion <br />